欢迎访问ic37.com |
会员登录 免费注册
发布采购

CS8900A-IQZ 参数 Datasheet PDF下载

CS8900A-IQZ图片预览
型号: CS8900A-IQZ
PDF下载: 下载PDF文件 查看货源
内容描述: 水晶局域网? ISA以太网控制器 [Crystal LAN ⑩ ISA Ethernet Controller]
分类和应用: 微控制器和处理器串行IO控制器通信控制器外围集成电路PC局域网以太网时钟
文件页数/大小: 138 页 / 2374 K
品牌: CIRRUS [ CIRRUS LOGIC ]
 浏览型号CS8900A-IQZ的Datasheet PDF文件第29页浏览型号CS8900A-IQZ的Datasheet PDF文件第30页浏览型号CS8900A-IQZ的Datasheet PDF文件第31页浏览型号CS8900A-IQZ的Datasheet PDF文件第32页浏览型号CS8900A-IQZ的Datasheet PDF文件第34页浏览型号CS8900A-IQZ的Datasheet PDF文件第35页浏览型号CS8900A-IQZ的Datasheet PDF文件第36页浏览型号CS8900A-IQZ的Datasheet PDF文件第37页  
CS8900A  
Crystal LAN™ Ethernet Controller  
attempting transmission. The CS8900A sup-  
ports two schemes for determining when to ini-  
not in Backoff, transmission begins the 9.6 µs  
IPG). If no transmit packet is pending, the  
tiate transmission: Two-Part Deferral, and MAC continues to monitor the network. If activ-  
Simple Deferral. Selection of the deferral ity is detected before a transmit frame is ready,  
scheme is determined by the 2-partDefDis bit  
(Register 13, LineCTL, Bit D). If the 2-partDef-  
Dis bit is clear, the MAC uses a two-part defer-  
ral process defined in section 4.2.3.2.1 of the  
Ethernet standard (ISO/IEC 8802-3, 1993). If  
the 2-partDefDis bit is set, the MAC uses a  
simplified deferral scheme. Both schemes are  
described below:  
the MAC defers to the transmitting station and  
resumes monitoring the network. Figure 11 di-  
agrams the simple deferral process.  
Start Monitoring  
Network Activity  
3.9.5.2 Two-Part Deferral  
In the two-part deferral process, the 9.6 µs In-  
ter Packet Gap (IPG) timer is started whenev-  
er the internal Carrier Sense signal is  
deasserted. If activity is detected during the  
first 6.4 µs of the IPG timer, the timer is reset  
and then restarted once the activity has  
stopped. If there is no activity during the first  
6.4 µs of the IPG timer, the IPG timer is al-  
lowed to time out (even if network activity is  
detected during the final 3.2 µs). The MAC  
then begins transmission if a transmit packet is  
ready and if it is not in Backoff (Backoff is de-  
scribed later in this section). If no transmit  
packet is pending, the MAC continues to mon-  
itor the network. If activity is detected before a  
transmit frame is ready, the MAC defers to the  
transmitting station and resumes monitoring  
the network.  
Ye s  
Network  
Active?  
No  
Start IPG  
Timer  
IPG  
Timer =  
Yes  
6.4 s?  
µ
No  
W ait  
3.2  
µ
s
No  
Network  
Active?  
Ye s  
The two-part deferral scheme was developed  
to prevent the possibility of the IPG being  
shortened due to a temporary loss of carrier.  
Figure 10 diagrams the two-part deferral pro-  
cess.  
No  
Tx  
Frame  
Ready and Not  
in Backoff?  
No  
Ye s  
Network  
Active?  
3.9.5.3 Simple Deferral  
Ye s  
In the simple deferral scheme, the IPG timer is  
started whenever Carrier Sense is deasserted.  
Once the IPG timer is finished (after 9.6 µs), if  
a transmit frame is pending and if the MAC is  
Transm it  
Fram e  
Figure 10. Two-Part Deferral  
CIRRUS LOGIC PRODUCT DATASHEET  
DS271F4  
33  
 复制成功!