欢迎访问ic37.com |
会员登录 免费注册
发布采购

PM4328-PI 参数 Datasheet PDF下载

PM4328-PI图片预览
型号: PM4328-PI
PDF下载: 下载PDF文件 查看货源
内容描述: 高密度T1 / E1成帧器,集成M13多路复用器 [HIGH DENSITY T1/E1 FRAMER WITH INTEGRATED M13 MULTIPLEXER]
分类和应用: 复用器数字传输控制器电信集成电路电信电路异步传输模式ATM
文件页数/大小: 250 页 / 1399 K
品牌: PMC [ PMC-SIERRA, INC ]
 浏览型号PM4328-PI的Datasheet PDF文件第53页浏览型号PM4328-PI的Datasheet PDF文件第54页浏览型号PM4328-PI的Datasheet PDF文件第55页浏览型号PM4328-PI的Datasheet PDF文件第56页浏览型号PM4328-PI的Datasheet PDF文件第58页浏览型号PM4328-PI的Datasheet PDF文件第59页浏览型号PM4328-PI的Datasheet PDF文件第60页浏览型号PM4328-PI的Datasheet PDF文件第61页  
STANDARD PRODUCT  
PM4328 TECT3  
DATASHEET  
PMC-2011596  
ISSUE 1  
HIGH DENSITY T1/E1 FRAMER  
AND M13 MULTIPLEXER  
Pin Name  
Type Pin Function  
No.  
This signal shares a pin with signal ED[12].  
SAV5  
Input A3  
System Add Bus Payload Indicator (SAV5). The add  
bus payload indicator locates the position of the  
floating payloads for each tributary within the SBI bus  
structure. Timing differences between the tributary  
timing and the synchronous SBI bus are indicated by  
adjustments of this payload indicator relative to the  
fixed SBI bus structure.  
All timing adjustments indicated by this signal must be  
accompanied by appropriate adjustments in the SAPL  
signal.  
The TECT3 only monitors the add bus payload  
Indicator signal during the tributary timeslots assigned  
to this device.  
SAV5 is sampled on the rising edge of SREFCLK.  
This signal shares a pin with signal ED[11].  
SAJUST_REQ  
Output D7  
Tristate  
System Add Bus Justification Request  
(SAJUST_REQ). The justification request signals the  
Link Layer device to speed up, slow down or maintain  
the rate which it is sending data to the TECT3. This is  
only used when the TECT3 is the timing master for the  
tributary transmit direction.  
This active high signal indicates negative timing  
adjustments when asserted high during the V3 or H3  
octet of the tributary. In response to this the Link Layer  
device sends an extra byte in the V3 or H3 octet of the  
next SBI bus multi-frame.  
Positive timing adjustments are requested by asserting  
justification request high during the octet following the  
V3 or H3 octet. The Link Layer device responds to this  
request by not sending an octet during the V3 or H3  
octet of the next multi-frame.  
The TECT3 only drives the justification request signal  
during the tributary timeslots assigned to this device.  
SAJUST_REQ is updated on the rising edge of  
SREFCLK.  
PROPRIETARY AND CONFIDENTIAL  
44  
 复制成功!