DC & Switching Characteristics
Preliminary status means the timing model is subject to change. Initially,
timing numbers are created using simulation results, process data, and
other known parameters. These tests are used to make the preliminary
numbers as close to the actual timing parameters as possible.
Final timing numbers are based on actual device operation and testing.
These numbers reflect the actual performance of the device under worst-
case voltage and junction temperature conditions.
Table 5–13. MAX II Device Timing Model Status
Device
Preliminary
Final
v
EPM240
EPM570
v
EPM1270
EPM2210
v
v
Altera Corporation
July 2006
Core Version a.b.c variable
5–11