S/UNI®-ATLAS-3200 Telecom Standard Product Data Sheet
Preliminary
Note, in the unlikely event that a segment VPC-AIS cell is received on the end-to-end VPC
connection, no action would be taken at the F5 level. This is because the VPC connection is only
configured as an end-to-end point and no segment OAM cells should be received. The end-to-
end VPC connection would only terminate the segment VPC-AIS cell and no further action
would be taken at the F4 level.
The table below summarizes the behavior of the S/UNI-ATLAS-3200 for F4 to F5 Fault
Management:
Table 28 F4 to F5 Fault Management Processing
Actions taken by S/UNI- VC
VC Segment
End-Point
VC
VC Non End-Point
ATLAS-3200 upon
Connection
End-Point
Connection
End-Point and
Segment End-
Point
receipt of F4 AIS cells
VP
Received
Cell at F4
level
Within a VC
Segment
Not within a
Termination
Type
VC Segment
VP
VP End-to- Generate VC
Generate VC
Segment RDI
(1), (4)
Generate VC
End-to-End
AIS (2), (4)
Generate VC
End-to-End
RDI (4)
Generate VC
Segment RDI
(1), (4)
Generate VC
Segment AIS
(3), (4)
Generate VC
End-to-End
AIS (4)
Generate VC
End-to-End
AIS (4)
Connection
End-Point
and
End AIS
End-to-End
RDI (4)
Segment
End-Point
Generate VP End-to-End RDI cell on the End-to-End F4 connection.
VP
Generate VC
End-to-End
RDI (5), (4)
Generate VC
Segment RDI
(4)
Generate VC
End-to-End
RDI (4) (5)
Generate VC
Segment AIS
(3), (4)
Generate VC
End-to-End
AIS (4), (6)
Segment
AIS
Generate VC
End-to-End
AIS (4), (6)
Generate VC
Segment RDI
(4)
Generate VC
End-to-End
AIS (4), (6)
Generate VP Segment RDI cell on the Segment F4 connection.
VP
VP End-to- Generate VC
Generate VC
Segment RDI
(1), (4)
Generate VC
End-to-End
AIS (2), (4)
Generate VC
End-to-End
RDI (4)
Generate VC
Segment RDI
(1), (4)
Generate VC
Segment AIS
(3), (4)
Generate VC
End-to-End
AIS (4)
Generate VC
End-to-End
AIS (4)
Connection
End-Point
Only
End AIS
End-to-End
RDI (4)
Generate VP End-to-End RDI cell on the End-to-End F4 connection.
VP
No action is
No action is
No action is
No action is
No action is
taken.
Segment
AIS
taken.
taken.
taken.
taken.
No action is taken. This represents an unusual case where an F4 segment AIS
cell is received on a F4 connection end-point. The segment AIS cell will be
terminated at the VP connection end-point, but no other action is taken.
Proprietary and Confidential to PMC-Sierra, Inc., and for its Customers’ Internal Use
Document ID: PMC-1990553, Issue 4
114