欢迎访问ic37.com |
会员登录 免费注册
发布采购

B1101UC4 参数 Datasheet PDF下载

B1101UC4图片预览
型号: B1101UC4
PDF下载: 下载PDF文件 查看货源
内容描述: [Surge Protection Circuit, PDSO6, MODIFIED, MS-013, 6 PIN]
分类和应用: 电信光电二极管电信集成电路
文件页数/大小: 212 页 / 1843 K
品牌: TECCOR [ TECCOR ELECTRONICS ]
 浏览型号B1101UC4的Datasheet PDF文件第128页浏览型号B1101UC4的Datasheet PDF文件第129页浏览型号B1101UC4的Datasheet PDF文件第130页浏览型号B1101UC4的Datasheet PDF文件第131页浏览型号B1101UC4的Datasheet PDF文件第133页浏览型号B1101UC4的Datasheet PDF文件第134页浏览型号B1101UC4的Datasheet PDF文件第135页浏览型号B1101UC4的Datasheet PDF文件第136页  
GR 1089–Core  
Table 4.7 Second Level AC Power Fault Test for Non-Customer Premises Equipment  
Short Circuit Current  
per Conductor  
Test  
Applied Voltage, 60 Hz  
(VRMS  
(A)  
Test Connections  
(Notes 1, 2)  
)
(Note 5)  
25  
60  
Duration  
15 min  
5 s  
(Table 4.1, Figure 4.1)  
1
2
120, 277  
600  
A
A
3
600  
7
5 s  
A
4 (Note 3)  
5 (Note 4)  
100-600  
N/A  
2.2A at 600 V  
N/A  
15 min  
15 min  
A
N/A  
Notes:  
1. Primary protectors are removed for all tests.  
2. For EUT containing secondary voltage limiting and current limiting protectors, tests are to be performed at the indicated voltage(s)  
and repeated at a reduced voltage and current just below the operating threshold of the secondary protectors.  
3. This test is to be performed between the ranges of 100 V to 600 V and is intended to produce the greatest heating affect.  
4. Test 5 simulates a high impedance induction fault. Specific information regarding this test is available upon request.  
5. These tests are repeated using a short-circuit value just below the operating threshold of the current limiting device, or, if the EUT  
uses a fuse as current limiting protection, the fuse may be bypassed and the short circuit current available adjusted to 135% of the  
fuse rating.  
6. Intra-building, second level lower fault test uses test condition 1 only. The applied voltage is at 120 V rms only.  
Second Level AC Power Fault for Customer Premises Equipment  
For customer premises equipment, the EUT is tested to the conditions presented in  
Table 4.8 and connected to a circuit equivalent to that shown in Figure 4.2. During this test,  
the wiring simulator cannot open. For equipment that uses premises type of wiring, the  
wiring simulator is a 1.6 A Type MDQ fuse from Bussman. For equipment that is connected  
by cable, the wiring simulator is a piece of 26-gauge copper wire.  
Table 4.8 Second Level AC Power Fault for Customer Premises Equipment  
Applied Voltage, 60 Hz  
(VRMS  
)
Source Impedance  
Test Connections  
Test  
1
2
(Notes 2, 3)  
300  
(Table 4.1, Figure 4.2)  
20  
20  
(Note 1)  
A
600  
Notes:  
1. Applied between exposed surfaces and Ground  
2. The 60 Hz signal is applied with an initial amplitude of 30 V rms and increased by 20% every 15 minutes until one of the following  
occurs:  
— Voltage reaches the maximum specified  
— Current reaches 20 A or the wiring simulator opens  
— EUT fails open circuit  
3. If the EUT fails open circuit, the test continues for an additional 15 minutes to ensure that another component of the EUT does not  
create a fire, fragmentation, or electrical safety hazard.  
http://www.teccor.com  
+1 972-580-7777  
4 - 8  
© 2002 Teccor Electronics  
SIDACtor Data Book and Design Guide  
®
 复制成功!