欢迎访问ic37.com |
会员登录 免费注册
发布采购

5962-9958502QXC 参数 Datasheet PDF下载

5962-9958502QXC图片预览
型号: 5962-9958502QXC
PDF下载: 下载PDF文件 查看货源
内容描述: [Field Programmable Gate Array, 36000 Gates, 2414-Cell, CMOS, CQFP256, CERAMIC, QFP-256]
分类和应用: 可编程逻辑
文件页数/大小: 217 页 / 1554 K
品牌: ACTEL [ Actel Corporation ]
 浏览型号5962-9958502QXC的Datasheet PDF文件第194页浏览型号5962-9958502QXC的Datasheet PDF文件第195页浏览型号5962-9958502QXC的Datasheet PDF文件第196页浏览型号5962-9958502QXC的Datasheet PDF文件第197页浏览型号5962-9958502QXC的Datasheet PDF文件第199页浏览型号5962-9958502QXC的Datasheet PDF文件第200页浏览型号5962-9958502QXC的Datasheet PDF文件第201页浏览型号5962-9958502QXC的Datasheet PDF文件第202页  
MIL-PRF-38535K  
APPENDIX J  
J.3.10.1 Group A inspection. Group A inspection shall be performed on each inspection lot and shall consist of  
electrical parameter tests specified for the specified device. Group A inspection may be performed in any order.  
J.3.10.2 Group B inspection. Group B inspection shall be performed on each inspection lot, for each qualified  
package type and lead finish. Group B shall consist of mechanical and environmental tests for the specified device  
class. Resubmission procedures shall be documented in the QM plan. For solderability, a statistical sound sample  
size (sample sizes indicated in TM 5005 of MIL-STD-883 are acceptable, as a minimum) consisting of leads from  
several packages shall be tested with zero failures. The actual number shall be determined by the TRB and detailed  
in the TCI procedures in the QM plan.  
J.3.10.3 Group C inspection. Group C inspection shall include die related tests specified which are performed  
periodically. Resubmission procedures shall be documented in the QM plan. Where group C end-points are done on  
actual devices, group C end-points shall be specified in the device specification.  
J.3.10.4 Group D inspection. Group D inspection shall include package related tests which are performed  
periodically. Resubmission procedures shall be documented in the QM plan. Where group D end-points are done on  
actual devices, group D end-points shall be specified in the device specification.  
J.3.10.5 Group E inspection. When applicable, group E inspection shall include RHA tests on each wafer lot. The  
post-irradiation parameter limits (PIPL), transient, and single event phenomenon (SEP) response (as applicable), and  
test conditions shall be as specified in the device specification.  
J.3.10.6 End-point tests for groups C, D, (E if applicable). End-point measurements and other specified post-test  
measurements shall be made for each sample after completion of all other specified tests in the subgroup. The test  
limits for the end-point measurements shall be the same as the test limits for the respective group A subgroup  
inspections. Different end-points may be specified for group E tests in the detail specifications. Any additional  
end-point electrical measurements may be performed at the discretion of the manufacturer.  
J.3.10.7 End-of-line TCI testing (option 1). All microcircuits used in end-of-line TCI testing that meet the  
requirements of this specification and the device specification and are subjected to destructive tests or which fail any  
test shall not be shipped on the contract or order as acceptable QML product. They may, however, be delivered at  
the request of the acquiring activity, if they are isolated from, and clearly identified so as to prevent their being  
mistaken for acceptable product. Sample microcircuits, from lots which have passed quality assurance inspections or  
tests and which have been subjected to mechanical or environmental tests specified in groups B, C, and D inspection  
and not classified as destructive, may be shipped on the contract or order provided the test has been proven to be  
nondestructive (see A.4.3.2.3) and each of the microcircuits subsequently passes final electrical tests in accordance  
with the applicable device specification.  
J.3.11 In-line TCI testing (option 2). In-line control testing shall be performed through the use of the approved  
SEC or QML microcircuit. The in-line control test plan shall show how all the groups A, B, C, D, and E test conditions  
are incorporated under statistical process control or process control to allow in-line control monitoring. The following  
shall also be addressed. Groups A, B, C, D, and E requirements are found in tables II through V and table C-I.  
184  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 复制成功!