欢迎访问ic37.com |
会员登录 免费注册
发布采购

PM9312-UC 参数 Datasheet PDF下载

PM9312-UC图片预览
型号: PM9312-UC
PDF下载: 下载PDF文件 查看货源
内容描述: 增强TT1 ™交换机结构 [ENHANCED TT1⑩ SWITCH FABRIC]
分类和应用:
文件页数/大小: 343 页 / 5229 K
品牌: PMC [ PMC-SIERRA, INC ]
 浏览型号PM9312-UC的Datasheet PDF文件第100页浏览型号PM9312-UC的Datasheet PDF文件第101页浏览型号PM9312-UC的Datasheet PDF文件第102页浏览型号PM9312-UC的Datasheet PDF文件第103页浏览型号PM9312-UC的Datasheet PDF文件第105页浏览型号PM9312-UC的Datasheet PDF文件第106页浏览型号PM9312-UC的Datasheet PDF文件第107页浏览型号PM9312-UC的Datasheet PDF文件第108页  
Released  
PMC-Sierra, Inc.  
PM9311/2/3/5 ETT1™ CHIP SET  
Data Sheet  
PMC-2000164  
ISSUE 3  
ENHANCED TT1™ SWITCH FABRIC  
6. Bring up new board. See “Port Board being added:” on page 87.  
7. Enable TDM traffic in Scheduler for this port. TDM Traffic can now flow to/from this new port board.  
8. Refresh state information from this new port to Schedulers. (See Section 1.9.4 “Scheduler Refresh  
Procedure”) This is only necessary if the linecard sends traffic before the link to the Scheduler  
board comes up. Re-establish primary and secondary Schedulers in every port.  
9. Best-effort traffic can now flow to/from this new port board.  
1.9.6.2 Crossbar Board  
The steps needed to replace a failed Crossbar board on a non-redundant Crossbar configuration and a  
redundant Crossbar configuration are different.  
For a non-redundant Crossbar configuration, a failed Crossbar board causes all traffic in the entire system  
to be disabled. These are the following steps required after detection of a failed Crossbar board.  
1. Detect failed Crossbar board. For example, CPU is indicated of loss of connectivity from this board  
to any one of the existing port boards.  
2. Immediately disable TDM and non-TDM traffic for all ports in the Schedulers.  
3. Disable the AIB links to/from the Port board.  
4. Replace failed Crossbar board.  
5. Bring up new board (see “Crossbar Board being added:” on page 90)  
6. Enable TDM and best-effort traffic for all ports in the Scheduler.  
7. Traffic can now flow.  
The steps needed to cope with a failed Crossbar board on a redundant Crossbar configuration are  
described here. A failed Crossbar board does not require traffic to be disabled. The redundant Crossbar  
board carries traffic while the failed Crossbar board is replaced. These are the necessary steps to follow.  
1. Detect failed Crossbar board. For example, CPU is indicated of loss of connectivity from this board  
to any one of the existing port boards.  
2. Disable the AIB links to/from the Port board.  
3. Replace failed Crossbar board.  
4. Bring up new board (see “Crossbar Board being added:” on page 90)  
5. Crossbars are now in fault tolerant mode.  
100  
PROPRIETARY AND CONFIDENTIAL TO PMC-SIERRA, INC., AND FOR ITS CUSTOMERS’ INTERNAL USE  
 复制成功!