欢迎访问ic37.com |
会员登录 免费注册
发布采购

PM9312-UC 参数 Datasheet PDF下载

PM9312-UC图片预览
型号: PM9312-UC
PDF下载: 下载PDF文件 查看货源
内容描述: 增强TT1 ™交换机结构 [ENHANCED TT1⑩ SWITCH FABRIC]
分类和应用:
文件页数/大小: 343 页 / 5229 K
品牌: PMC [ PMC-SIERRA, INC ]
 浏览型号PM9312-UC的Datasheet PDF文件第99页浏览型号PM9312-UC的Datasheet PDF文件第100页浏览型号PM9312-UC的Datasheet PDF文件第101页浏览型号PM9312-UC的Datasheet PDF文件第102页浏览型号PM9312-UC的Datasheet PDF文件第104页浏览型号PM9312-UC的Datasheet PDF文件第105页浏览型号PM9312-UC的Datasheet PDF文件第106页浏览型号PM9312-UC的Datasheet PDF文件第107页  
Released  
PMC-Sierra, Inc.  
PM9311/2/3/5 ETT1™ CHIP SET  
Data Sheet  
PMC-2000164  
ISSUE 3  
ENHANCED TT1™ SWITCH FABRIC  
1.9.5 Refresh Schedulers After Modifying Registers  
The CPU cannot guarantee to modify the same register in both Schedulers at exactly the same instant,  
even using an OOB multicast write to all Schedulers. Consequently there are certain Scheduler registers  
which, when modified, require a refresh process to occur (assuming a system with two Schedulers). Table  
20 list these registers.  
Table 20. Refresh-sensitive Registers in the Scheduler  
Address  
00004h  
Access  
Register  
Symbol  
Read/Write  
Read/Write  
Read/Write  
Read/Write  
Read/Write  
Read/Write  
Read/Write  
Read/Write  
Control and Reset  
Enable Port  
SCTRLRS  
SENBPRT  
SNTDMEN  
STDMEN  
SPORTRS  
SPORTFRZ  
STDMCTRL  
SPLL  
00038H  
00080h  
00084h  
00088h  
0008Ch  
0009Ch  
00100h  
Enable non-TDM Traffic  
Enable TDM Traffic  
Reset Port  
Freeze Port  
TDM Control  
PLL control/status  
1.9.6 Hard Errors  
This section describes the sequence of events that need to take place to correctly replace a failed board.  
When a board is replaced, it must be resynchronized with an already running system. In this section, we  
address each type of board replacement and describe how to resynchronize the board.  
1.9.6.1 Port Board  
When a port board fails, the Schedulers must disable traffic flowing to/from this port. All the cells currently  
stored in the input and output queues of the failed port board will be lost. These are the following steps  
required to replace the failed port board.  
NOTE: The failure of the port board may also cause the primary Scheduler to shut down.  
1. Detect failed port board.  
2. Disable TDM and best-effort traffic in the Scheduler(s) to/from this port.  
3. Disable this port in the Scheduler’s SENBPRT register.  
4. Disable the AIB links to/from the Crossbars and Schedulers.  
5. Replace failed port board.  
PROPRIETARY AND CONFIDENTIAL TO PMC-SIERRA, INC., AND FOR ITS CUSTOMERS’ INTERNAL USE  
99  
 
 复制成功!