内容描述: 离线式开关电源电流模式控制器,集成500V启动电池 [Off-Line SMPS Current Mode Controller with integrated 500V Startup Cell]
分类和应用: 稳压器开关式稳压器或控制器电源电路电池开关式控制器光电二极管
文件页数/大小: 23 页 / 486 K
品牌: INFINEON [ Infineon ]
 浏览型号ICE3BS02的Datasheet PDF文件第5页浏览型号ICE3BS02的Datasheet PDF文件第6页浏览型号ICE3BS02的Datasheet PDF文件第7页浏览型号ICE3BS02的Datasheet PDF文件第8页浏览型号ICE3BS02的Datasheet PDF文件第10页浏览型号ICE3BS02的Datasheet PDF文件第11页浏览型号ICE3BS02的Datasheet PDF文件第12页浏览型号ICE3BS02的Datasheet PDF文件第13页  
F3  
ICE3AS02 / ICE3AS02G / ICE3BS02 / ICE3BS02G  
Functional Description  
Once the malfunction condition is removed, this block  
will then turn back on. The recovery from Auto Restart  
Mode does not require disconnecting the SMPS from  
the AC line.  
VSoftS  
max. Startup Phase  
When Active Burst Mode is entered, the internal Bias is  
switched off in order to reduce the current consumption  
to below 1.05mA while keeping the Voltage Reference  
active as this is necessary in this mode.  
5.4V  
4V  
3.3  
Startup Phase  
1V  
max. Soft Start Phase  
6.5V  
DCmax  
t
3.25k  
DC  
1
R
T2  
SoftS  
DC  
2
T3  
1V  
SoftS  
C
SoftS  
t1  
t2 t  
Soft Start  
Soft-Start  
Comparator  
Gate Driver  
Figure 6  
Startup Phase  
C7  
&
By means of this extra charge stage, there is no delay  
in the beginning of the Startup Phase when there is still  
no switching. Furthermore Soft Start is finished at 4V to  
have faster the maximum power capability. The duty  
cycles DC1 and DC2 are depending on the mains and  
the primary inductance of the transformer. The  
limitation of the primary current by DC2 is related to  
VSoftS = 4V. But DC1 is related to a maximum primary  
current which is limited by the internal Current Limiting  
with CS = 1V. Therefore the maximum Startup Phase  
is divided into a Soft Start Phase until t1 and a phase  
from t1 until t2 where maximum power is provided if  
demanded by the FB signal.  
G7  
C2  
4V  
0.85V  
CS  
x3.7  
PWM OP  
Soft Start  
Figure 5  
At the beginning of the Startup Phase, the IC provides  
a Soft Start duration whereby it controls the maximum  
primary current by means of a duty cycle limitation. A  
signal VSoftS which is generated by the external  
capacitor CSofts in combination with the internal pull up  
resistor RSoftS, determines the duty cycle until VSoftS  
exceeds 4V.  
When the Soft Start begins, CSoftS is immediately  
charged up to approx. 1V by T2. Therefore the Soft  
Start Phase takes place between 1V and 4V. Above  
VSoftsS = 4V there is no longer duty cycle limitation  
DCmax which is controlled by comparator C7 since  
comparator C2 blocks the gate G7 (see Figure 5). The  
maximum charge current in the very first stage when  
VSoftS is below 1V, is limited to 1.32mA.  