欢迎访问ic37.com |
会员登录 免费注册
发布采购

5962-0421901QUA 参数 Datasheet PDF下载

5962-0421901QUA图片预览
型号: 5962-0421901QUA
PDF下载: 下载PDF文件 查看货源
内容描述: [Field Programmable Gate Array, 250000 Gates, CMOS, CPGA624, CERAMIC, CGA-624]
分类和应用: 可编程逻辑
文件页数/大小: 217 页 / 1554 K
品牌: ACTEL [ Actel Corporation ]
 浏览型号5962-0421901QUA的Datasheet PDF文件第15页浏览型号5962-0421901QUA的Datasheet PDF文件第16页浏览型号5962-0421901QUA的Datasheet PDF文件第17页浏览型号5962-0421901QUA的Datasheet PDF文件第18页浏览型号5962-0421901QUA的Datasheet PDF文件第20页浏览型号5962-0421901QUA的Datasheet PDF文件第21页浏览型号5962-0421901QUA的Datasheet PDF文件第22页浏览型号5962-0421901QUA的Datasheet PDF文件第23页  
MIL-PRF-38535K  
3.3 Quality management (QM) program. A QM program shall be implemented by the manufacturer (see G.3.1).  
3.3.1 Manufacturer's review system. The Technology Review Board (TRB) (See G.3.2) shall implement a dedicated  
system of review. The TRB shall review, approve and document the implementation of the QM program, as reflected in the  
QM plan; maintenance of all certified and qualified processes; process change control; reliability data analysis, failure analysis  
(FA), and corrective actions; QML microcircuit recall procedures; and qualification status of the technology.  
3.3.2 QM plan. A QM plan reflects the major elements of the manufacturer's QML process (see G.3.3). The QM plan shall  
be kept current and up-to-date and shall reflect all major changes. Whenever the TRB makes major changes to the QM plan,  
copies of the updated QM plan shall be submitted to the QA for review.  
3.3.3 Self-assessment program. The manufacturer’s TRB shall ensure that a self-assessment program is implemented and  
perform evaluations on a periodic basis of all areas controlled by the QM Plan. Results of the self-assessment including  
corrective actions shall be documented by the TRB and shall be made available for review to the QA (see G.3.1).  
3.3.4 Change control procedures. The manufacturer shall have a system that shall provide notification of change that  
affects form, fit, function and radiation (when applicable) to all known acquiring activities prior to the release of the affected  
product. The manufacturer may make notification of this change of product through the Government-Industry Data Exchange  
Program (GIDEP) using the Product Change Notice. In any case, the manufacturer shall assure that all known acquiring  
activities are notified. The following processes and procedures shall be addressed (see G.3.4):  
a. Design methodology changes.  
b. Fabrication process changes.  
c. Assembly process changes.  
d. Package changes.  
e. Test facility changes.  
f. Location changes to fabrication, assembly, test, and qualification.  
3.3.4.1 Discontinuation of products. The manufacturer shall have a system that provides notification of product  
discontinuation which comprises date of discontinuation and last times buy opportunity in advance (at least 6 month in  
advance) to the DLA Land and Maritime for purchasing devices.  
3.4 Requirements for listing on a QML. To be listed on a QML, the manufacturer shall demonstrate compliance to the QML  
certification requirements (see 3.4.1), demonstrate compliance to the QML qualification requirements (see 3.4.2), and work  
with the DLA Land and Maritime to develop an SMD describing the candidate QML device(s) (see 3.5). An existing MIL-M-  
38510 device specification may be used. The QA shall verify compliance to the requirements and shall list the manufacturer's  
technology on the QML.  
5
 
 
 
 
 
 
 
 
 
 
 
 
 
 复制成功!