欢迎访问ic37.com |
会员登录 免费注册
发布采购

GRM2195C1H682JA01D 参数 Datasheet PDF下载

GRM2195C1H682JA01D图片预览
型号: GRM2195C1H682JA01D
PDF下载: 下载PDF文件 查看货源
内容描述: 片状独石陶瓷电容器 [Chip Monolithic Ceramic Capacitors]
分类和应用: 电容器陶瓷电容器
文件页数/大小: 221 页 / 4341 K
品牌: MURATA [ muRata ]
 浏览型号GRM2195C1H682JA01D的Datasheet PDF文件第137页浏览型号GRM2195C1H682JA01D的Datasheet PDF文件第138页浏览型号GRM2195C1H682JA01D的Datasheet PDF文件第139页浏览型号GRM2195C1H682JA01D的Datasheet PDF文件第140页浏览型号GRM2195C1H682JA01D的Datasheet PDF文件第142页浏览型号GRM2195C1H682JA01D的Datasheet PDF文件第143页浏览型号GRM2195C1H682JA01D的Datasheet PDF文件第144页浏览型号GRM2195C1H682JA01D的Datasheet PDF文件第145页  
• This PDF catalog is downloaded from the website of Murata Manufacturing co., ltd. Therefore, it’s specifications are subject to change or our products in it may be discontinued without advance notice. Please check with our  
!Note  
C02E.pdf  
10.12.20  
sales representatives or product engineers before ordering.  
• This PDF catalog has only typical specifications because there is no space for detailed specifications. Therefore, please approve our product specifications or transact the approval sheet for product specifications before ordering.  
!Caution  
Continued from the preceding page.  
4-2. Flow Soldering  
1. When sudden heat is applied to the components, the  
mechanical strength of the components will decrease  
because a sudden temperature change causes  
deformation inside the components. In order to prevent  
mechanical damage in the components, preheating  
should be required for both of the components and the  
PCB board.  
[Standard Conditions for Flow Soldering]  
Temperature (D)  
Soldering  
Soldering  
Peak  
Gradual  
Cooling  
Temperature  
T  
Preheating  
Peak  
Temperature  
Preheating conditions are shown in table 2. It is required  
to keep the temperature differential between the solder  
and the component's surface (T) as small as possible.  
2. Excessively long soldering time or high soldering  
temperature can result in leaching of the outer electrodes,  
causing poor adhesion or a reduction in capacitance  
value due to loss of contact between electrodes and end  
termination.  
Preheating  
Time  
30-90 seconds  
5 seconds max.  
[Allowable Flow Soldering Temperature and Time]  
280  
270  
3. When components are immersed in solvent after  
mounting, be sure to maintain the temperature difference  
(T) between the component and solvent within the range  
shown in the table 2.  
260  
250  
240  
230  
220  
4. Do not apply flow soldering to chips not listed in table 2.  
0
10  
20  
30  
40  
Soldering Time (sec.)  
Table 2  
Part Number  
GRM18/21/31  
LLL21/31  
Temperature Differential  
In a case of repeated soldering, the accumulated  
soldering time must be within the range shown above.  
TV150°C  
GQM18/21  
Recommended Conditions  
Pb-Sn Solder  
Lead Free Solder  
100 to 120°C  
250 to 260°C  
N2  
Preheating Peak Temperature  
Soldering Peak Temperature  
Atmosphere  
90 to 110°C  
240 to 250°C  
Air  
Pb-Sn Solder: Sn-37Pb  
Lead Free Solder: Sn-3.0Ag-0.5Cu  
5. Optimum Solder Amount for Flow Soldering  
5-1. The top of the solder fillet should be lower than the  
thickness of components. If the solder amount is  
excessive, the risk of cracking is higher during board  
bending or any other stressful condition.  
Up to Chip Thickness  
Adhesive  
in section  
Continued on the following page.  
139  
 复制成功!