欢迎访问ic37.com |
会员登录 免费注册
发布采购

CAR2012TE 参数 Datasheet PDF下载

CAR2012TE图片预览
型号: CAR2012TE
PDF下载: 下载PDF文件 查看货源
内容描述: [Universal input with PFC Constant power characteristic 2 front panel LEDs: 1-input;2]
分类和应用: 功率因数校正
文件页数/大小: 20 页 / 444 K
品牌: LINEAGEPOWER [ LINEAGE POWER CORPORATION ]
 浏览型号CAR2012TE的Datasheet PDF文件第12页浏览型号CAR2012TE的Datasheet PDF文件第13页浏览型号CAR2012TE的Datasheet PDF文件第14页浏览型号CAR2012TE的Datasheet PDF文件第15页浏览型号CAR2012TE的Datasheet PDF文件第17页浏览型号CAR2012TE的Datasheet PDF文件第18页浏览型号CAR2012TE的Datasheet PDF文件第19页浏览型号CAR2012TE的Datasheet PDF文件第20页  
Data Sheet  
GE  
CAR2012TE series rectifier  
Input: 85Vac to 264Vac; Output: 12 Vdc @ 2000W; 3.3Vdc or 5 Vdc @ 4A  
EEPROM record (0xD9): 64 bytes of EEPROM memory is  
available for customer records such as an additional FRU_ID.  
Block write is utilized since more than 2 data bytes are  
feasible. The first byte will be written into the pointed to  
memory location and each subsequent byte is incremented  
by a single memory location.  
functioning. The system controller must determine whether  
the function is working properly.  
Valid data bytes are: 0x00, 0x01,0x10,0x11  
Fault management  
The power supply recognizes that certain transitionary states  
can occur before a final state is reached. The STATUS and  
ALARM registers will not be frozen into a notification state  
until the final state is reached. Once a final state is reached  
the SMBAlert# signal is set and the STATUS and ALARM  
registers will not get reinstated until a clear_faults is issued by  
the master. The only exception is that additional state  
changes may be added to the original list if further changes  
are noted.  
The standard protocol to access these records takes the form;  
1
S
8
1
A
8
1
A
Slave address  
Wr  
Command 0xD9  
8
1
A
8
1
Memory location  
Byte count 32  
A
8
1
A
8
1
8
1
A
1
The power supply differentiates between internal faults that  
are within the power supply and external faults that the  
power supply protects itself from, such as overload or input  
voltage out of limits. The FAULT LED, FAULT PIN or i2c alarm is  
not asserted for EXTERNAL FAULTS. Every attempt is made to  
annunciate External Faults. Some of these annunciations can  
be observed by looking at the input LEDs. These fault  
categorizations are predictive in nature and therefore there is  
a likelihood that a categorization may not have been made  
correctly.  
Byte 1  
………………….. Byte 32  
A
PEC  
P
The highest memory location is address 0x64b.  
Test Function (0xDF): This command can be used to exercise  
the LEDs of the power supply or the output Or’ing feature of  
the power supply.  
Bit  
0
Function  
State  
1:ON, 0:OFF  
Input voltage out of range: The Input LED will continue  
blinking as long as sufficient power is available to power the  
LED. If the input voltage is completely gone the Input LED is  
OFF.  
LED test  
reserved  
reserved  
reserved  
Or’ing test  
reserved  
reserved  
reserved  
1
2
3
4
1:execute, 0:idle  
State change definition  
5
6
A state_change is an indication that an event has occurred  
that the MASTER should be aware of. The following events  
shall trigger a state_change;  
7
Setting bit 0 of the data byte to 1 instructs the power supply  
to execute an LED test. During this test both LEDs are turned  
ON and OFF every 0.5 second. The tri-state LED should be  
exercised sequentially in its green, orange, and red state. The  
test should continue until bit 0 of the data byte is set to 0 in a  
subsequent instruction.  
Initial power-up of the system when AC gets turned ON .  
This is the indication from the power supply that it has  
been turned ON.  
Whenever the power supply gets hot-plugged into a  
working system. This is the indicator to the system  
(MASTER) that a new power supply is on line.  
Setting bit 5 of the data byte to 1 instructs the power supply  
to execute once an output Or’ing test in applications where  
multiple paralleled power supplies are utilized. The host  
should verify that N+1 redundancy is established. If N+1  
redundancy is not established the test can fail. Only one  
power supply should be tested at a time.  
Any changes in the bit patterns of the STATUS and  
ALARM registers are a STATUS change which triggers the  
SMBALERT# flag.  
Note that a host-issued command such as turning the output  
OFF will not trigger an SMBAlert# even though the STATUS  
registers will change to indicate the latest state of the power  
supply.  
Verifying test completion should be delayed for  
approximately 30 seconds to allow the power supply  
sufficient time to properly execute the test.  
During the test the power supply will lower its output voltage  
and measure the difference between the internal and  
external sides of the Or’ing function. This measurement will  
determine whether the Or’ing function is working properly.  
Hot plug procedures  
Careful system control is recommended when hot plugging a  
power supply into a live system. It takes about 15 seconds for  
a power supply to configure its address on the bus based on  
the analog voltage levels present on the backplane. If  
communications are not stopped during this interval, multiple  
power supplies may respond to specific instructions because  
the address of the hot plugged power supply always defaults  
The system controller must conclude that sufficient power  
capacity exists to deliver output power to the system while  
this unit is purposely taken off the bus by lowering its output  
voltage. Since validity of the test is system control dependent,  
the power supply does not conclude whether it is properly  
February 9, 2014  
©2013 General Electric Company. All rights reserved.  
Page 16  
 复制成功!