欢迎访问ic37.com |
会员登录 免费注册
发布采购

CPC7582BATR 参数 Datasheet PDF下载

CPC7582BATR图片预览
型号: CPC7582BATR
PDF下载: 下载PDF文件 查看货源
内容描述: 线卡接入交换机 [Line Card Access Switch]
分类和应用:
文件页数/大小: 19 页 / 566 K
品牌: CLARE [ CLARE ]
 浏览型号CPC7582BATR的Datasheet PDF文件第9页浏览型号CPC7582BATR的Datasheet PDF文件第10页浏览型号CPC7582BATR的Datasheet PDF文件第11页浏览型号CPC7582BATR的Datasheet PDF文件第12页浏览型号CPC7582BATR的Datasheet PDF文件第14页浏览型号CPC7582BATR的Datasheet PDF文件第15页浏览型号CPC7582BATR的Datasheet PDF文件第16页浏览型号CPC7582BATR的Datasheet PDF文件第17页  
CPC7582  
Table” on page 10 and “CPC7582xC Truth Table” on  
page 11.  
ringing return switch (SW3) as the break switches  
(SW1 and SW2) close. The ringing switch (SW4)  
remains closed until the next zero-crossing of the  
ringing supply current. While in the make-before-break  
state, ringing potentials in excess of the CPC7582  
protection circuitry trigger levels will be diverted to  
ground.  
2.2.1 Make-Before-Break Operation - All Versions  
To use make-before-break operation, change the logic  
inputs to the talk state immediately following the  
ringing state. Application of the talk state opens the  
2.2.2 Make-Before-Break Operation for All Versions (Ringing to Talk Transition)  
Ringing  
Return  
Switches Switch  
(SW3)  
Ringing  
Switch  
(SW4)  
Break  
Test  
Switches  
IN  
IN  
T
SD  
State  
LATCH  
Timing  
RINGING  
TEST  
Ringing  
1
0
-
Off  
On  
On  
On  
Off  
Off  
On  
On  
Off  
Off  
Off  
Off  
SW4 waiting for next zero-current  
crossing to turn off. Maximum time is  
one-half of the ringing cycle. In this  
Make-  
before-  
break  
0
0
0
0
0
Floating transition state, current that is limited to  
the dc break switch current limit value  
will be sourced from the ring node of the  
SLIC.  
Talk  
Zero-cross current has occurred  
2.2.3 Break-Before-Make Operation - CPC7582xA/B  
switch (SW3) while the ringing switch remains  
on, waiting for the next zero current event.  
2. Hold the all off state for at least one-half of a  
ringing cycle to assure that a zero crossing event  
occurs and that the ringing switch (SW4) has  
opened.  
Break-before-make operation of the CPC7582xA/B  
can be achieved using two different techniques.  
The first method uses manipulation of the IN  
RINGING  
and IN  
logic inputs as shown in  
TEST  
“Break-Before-Make Operation CPC7582xA/B  
(Ringing to Talk Transition)” on page 13.  
Break-before-make operation occurs when the ringing  
switch opens before the break switches (SW1 and  
SW2) close.  
1. At the end of the ringing state apply the all off  
state (0, 0). This releases the ringing return  
2.2.4 Break-Before-Make Operation CPC7582xA/B (Ringing to Talk Transition)  
Ringing  
Return  
Switches Switch  
(SW3)  
Ringing  
Switch  
(SW4)  
Break  
Test  
Switches  
IN  
IN  
T
SD  
State  
LATCH  
Timing  
RINGING  
TEST  
Ringing  
All-Off  
1
1
0
1
-
Off  
On  
On  
On  
Off  
Off  
Hold this state for at least one-half of the  
ringing cycle. SW4 waiting for zero  
current to turn off.  
Off  
Off  
0
Floating  
Break-  
Before-  
Make  
1
0
1
0
SW4 has opened  
Off  
On  
Off  
Off  
Off  
Off  
Off  
Off  
Talk  
Close Break Switches  
2.2.5 Break-Before-Make Operation - All Versions  
the CPC7582xC. As shown in “CPC7582xA/B Truth  
Table” on page 10 and “CPC7582xC Truth Table” on  
The second break-before-make method for the  
CPC7582xA/B is also the only method available for  
page 11, the bidirectional T interface disables all of  
SD  
R05  
www.clare.com  
13  
 复制成功!