欢迎访问ic37.com |
会员登录 免费注册
发布采购

ADF4360-3BCPZ 参数 Datasheet PDF下载

ADF4360-3BCPZ图片预览
型号: ADF4360-3BCPZ
PDF下载: 下载PDF文件 查看货源
内容描述: 集成的合成器和VCO [Integrated Synthesizer and VCO]
分类和应用:
文件页数/大小: 24 页 / 317 K
品牌: ADI [ ADI ]
 浏览型号ADF4360-3BCPZ的Datasheet PDF文件第13页浏览型号ADF4360-3BCPZ的Datasheet PDF文件第14页浏览型号ADF4360-3BCPZ的Datasheet PDF文件第15页浏览型号ADF4360-3BCPZ的Datasheet PDF文件第16页浏览型号ADF4360-3BCPZ的Datasheet PDF文件第18页浏览型号ADF4360-3BCPZ的Datasheet PDF文件第19页浏览型号ADF4360-3BCPZ的Datasheet PDF文件第20页浏览型号ADF4360-3BCPZ的Datasheet PDF文件第21页  
Data Sheet  
ADF4360-3  
Hardware Power-Up/Power-Down  
Software Power-Up/Power-Down  
If the part is powered down via the hardware (using the CE pin)  
and powered up again without any change to the N counter  
register during power-down, the part locks at the correct  
frequency because the part is already in the correct frequency  
band. The lock time depends on the value of capacitance on the  
CN pin, which is <5 ms for 10 μF capacitance. The smaller  
capacitance of 440 nF on this pin enables lock times of <600 μs.  
If the part is powered down via the software (using the control  
latch) and powered up again without any change to the N  
counter latch during power-down, the part locks at the correct  
frequency because the part is already in the correct frequency  
band. The lock time depends on the value of capacitance on the  
CN pin, which is <5 ms for 10 μF capacitance. The smaller  
capacitance of 440 nF on this pin enables lock times of <600 μs.  
The N counter value cannot be changed while the part is in  
power-down, since the part may not lock to the correct  
frequency on power-up. If it is updated, the correct  
programming sequence for the part after power-up is to the R  
counter latch, followed by the control latch, and finally the N  
counter latch, with the required interval between the control  
latch and N counter latch, as described in the Initial Power-Up  
section.  
The N counter value cannot be changed while the part is in  
power-down because the part may not lock to the correct  
frequency on power-up. If it is updated, the correct  
programming sequence for the parts after power-up is to the R  
counter latch, followed by the control latch, and finally the N  
counter latch, with the required interval between the control  
latch and N counter latch, as described in the Initial Power-Up  
section.  
Rev. C | Page 17 of 24  
 复制成功!