欢迎访问ic37.com |
会员登录 免费注册
发布采购

A165E-S 参数 Datasheet PDF下载

A165E-S图片预览
型号: A165E-S
PDF下载: 下载PDF文件 查看货源
内容描述: [Separate Construction with Smallest Class of Depth in the World]
分类和应用:
文件页数/大小: 12 页 / 1939 K
品牌: OMRON [ OMRON ELECTRONICS LLC ]
 浏览型号A165E-S的Datasheet PDF文件第4页浏览型号A165E-S的Datasheet PDF文件第5页浏览型号A165E-S的Datasheet PDF文件第6页浏览型号A165E-S的Datasheet PDF文件第7页浏览型号A165E-S的Datasheet PDF文件第9页浏览型号A165E-S的Datasheet PDF文件第10页浏览型号A165E-S的Datasheet PDF文件第11页浏览型号A165E-S的Datasheet PDF文件第12页  
A165E  
Installation  
Mounting to the Panel (Models with Separate Construction)  
After installing the Operation Unit, snap in the Switch from the back of the panel.  
(1) Installing the Operation Unit  
Attach rubber packing or the  
Yellow Plate onto the Operation  
Unit from its terminal side. Insert  
the Operation Unit into the panel  
from the front. Install the lock ring  
and mounting nut from the  
Panel  
terminal side and tighten.  
Adjust the slits on the hole of  
rubber packing and Yellow Plate  
Mounting nut  
Lock  
to the protruding part of the Unit.  
Rubber packing is not necessary  
Rubber packing  
when the Yellow Plate is used.  
Tighten the nut to the torque of  
0.29 to 0.49 N·m.  
Cutout  
(included with the  
product) or Yellow  
Plate (sold separately)  
The Operation Unit should be  
installed with its  
Lock ring (included  
with the product)  
protruding part adjusted to the slit  
of the panel hole.  
Align the lock ring to the groove of  
the Operation Unit so that the  
edge is drawn to the panel side.  
Edge  
Panel  
Lock hole  
Lock ring (included  
with the product)  
Mounting nut (included  
with the product)  
Rubber packing (included with the product)  
or Yellow Plate (sold separately)  
(2) Mounting the Switch  
(3) Removing the Switch  
Snap on the Switch to the Operation Unit.  
Insert the prongs of the A16Z-5080 Extractor between the Switch and the  
Operation Unit, grip the Switch, and pull to remove.  
Make sure that the Switch has the correct orientation when snapping it onto the  
Operation Unit.  
Align the white dot on the Operation Unit with the guide groove on the side of  
the Switch marked with an “L” as shown below, and push the Switch into the  
Operation Unit until it clicks into place. Confirm that the Switch is securely in  
place before using.  
Guide groove  
White dot  
Extractor (A16Z-5080)  
L marking  
(4) Installing the LED Lamp  
When mounting the Lamp, make sure it is facing the direction shown in the  
following diagram. Insert the Lamp while matching the protruding part of the  
Lamp and the small guides on the outer surface of the switch.  
Narrow guide  
Protruding part  
Wide guide  
8
 复制成功!