欢迎访问ic37.com |
会员登录 免费注册
发布采购

MIC2585-2XYTS 参数 Datasheet PDF下载

MIC2585-2XYTS图片预览
型号: MIC2585-2XYTS
PDF下载: 下载PDF文件 查看货源
内容描述: 双通道热插拔控制器/定序 [Dual-Channel Hot Swap Controller/Sequencer]
分类和应用: 控制器
文件页数/大小: 28 页 / 274 K
品牌: MICREL [ MICREL SEMICONDUCTOR ]
 浏览型号MIC2585-2XYTS的Datasheet PDF文件第11页浏览型号MIC2585-2XYTS的Datasheet PDF文件第12页浏览型号MIC2585-2XYTS的Datasheet PDF文件第13页浏览型号MIC2585-2XYTS的Datasheet PDF文件第14页浏览型号MIC2585-2XYTS的Datasheet PDF文件第16页浏览型号MIC2585-2XYTS的Datasheet PDF文件第17页浏览型号MIC2585-2XYTS的Datasheet PDF文件第18页浏览型号MIC2585-2XYTS的Datasheet PDF文件第19页  
MIC2584/2585  
Micrel  
This second timing cycle (t  
voltage exceeds its FB pin threshold (V ). See Figure 4 in  
) begins when the lagging  
Functional Description  
Hot Swap Insertion  
POR  
FB  
the "Timing Diagrams". When the power supply is already  
present(i.e.,notahotswappingcondition)andtheMIC2584/  
85 device is enabled by applying a logic high signal at the ON  
pin, the GATE outputs begin ramping immediately as the first  
CPOR timing cycle is bypassed. Active current regulation is  
employedtolimittheinrushcurrenttransientresponseduring  
start-up by regulating the load current at the programmed  
current limit value (See "Current Limiting and Dual-Level  
Circuit Breaker" section). The following equation is used to  
determine the nominal current limit value:  
When circuit boards are inserted into live system backplanes  
and supply voltages, high inrush currents can result due to  
the charging of bulk capacitance that resides across the  
supply pins of the circuit board. This inrush current, although  
transient in nature, may be high enough to cause permanent  
damage to on-board components or may cause the systems  
supply voltages to go out of regulation during the transient  
period which may result in system failures. The MIC2584 and  
MIC2585actasacontrollerforexternalN-ChannelMOSFET  
devices in which the gate drive is controlled to provide inrush  
currentlimitingandoutputvoltageslewratecontrolduringhot  
swap insertions.  
V
50mV  
TRIPSLOW  
I
=
=
LIM  
(2)  
R
R
SENSE  
SENSE  
Power Supply  
where V  
in the electrical table and R  
is the current limit slow trip threshold found  
TRIPSLOW  
VCC1 is the main supply input to the MIC2584/85 controller  
with a voltage range of 2.3V to 13.2V. The VCC2 supply input  
ranges from 1.0V to 13.2V and must be less than or equal to  
VCC1 for operation. Both inputs can withstand transient  
spikes up to 20V. In order to ensure stability of the supplies,  
a minimum 1µF capacitor from each VCC to ground is  
recommended. Alternatively, a low pass filter, shown in the  
typical application circuit, can be used to eliminate high  
frequency oscillations as well as help suppress transient  
spikes.  
is the selected value that  
SENSE  
will set the desired current limit. There are two basic start-up  
modes for the MIC2584/85: 1)Start-up dominated by load  
capacitance and 2)start-up dominated by total gate capaci-  
tance. The magnitude of the inrush current delivered to the  
load will determine the dominant mode. If the inrush current  
is greater than the programmed current limit (I ), then load  
LIM  
capacitance is dominant. Otherwise, gate capacitance is  
dominant. The expected inrush current may be calculated  
using the following equation:  
Also, due to the existence of undetermined parasitic induc-  
tance in the absence of bulk capacitance, placing a Zener  
diode at each VCC of the controller to ground in order to  
provide external supply transient protection is strongly rec-  
ommended. See the typical application circuit in Figure 1.  
C
C
C
C
LOAD  
LOAD  
INRUSH  
where I  
I
×
14µA ×  
GATE  
(3)  
is the  
GATE  
GATE  
is the GATE pin pull-up current, C  
GATE  
LOAD  
load capacitance, and C  
is the total GATE capacitance  
GATE  
Start-Up Cycle  
(C  
of the external MOSFET and any external capacitor  
ISS  
connected from the MIC2584/85 GATE pin to ground).  
Supply Contact Delay  
Load Capacitance Dominated Start-Up  
DuringahotinsertofaPCboardintoabackplaneorwhenthe  
main supply (VCC1) is powered up from a cold start, as the  
voltage at the ON pin rises above its threshold (1.235V  
typical), the MIC2584/85 first checks that both supply volt-  
ages are above their respective UVLO thresholds. If so, then  
the device is enabled and an internal 2.5µA current source  
In this case, the load capacitance (C  
) is large enough to  
LOAD  
cause the inrush current to exceed the programmed current  
limit but is less than the fast-trip threshold (or the fast-trip  
threshold is disabled, Moption). During start-up under this  
condition, the load current is regulated at the programmed  
begins charging capacitor C  
to 0.3V to initiate a start-up  
current limit value (I ) and held constant until the output  
POR  
LIM  
sequence. Once the start-up delay (t  
CPOR pin is pulled immediately to ground and a separate  
14µA current source begins charging each GATE output to  
) elapses, the  
voltage rises to its final value. The output slew rate and  
equivalent GATE voltage slew rate is computed by the  
following equation:  
START  
drive the external MOSFET that switches V to V  
programmed contact start-up delay is calculated using the  
following equation:  
. The  
IN  
OUT  
I
LIM  
Output Voltage Slew Rate,dV  
/dt =  
OUT  
(4)  
C
LOAD  
where I  
quently, the value of C  
the overcurrent response time, t  
is the programmed current limit value. Conse-  
VSTART  
LIM  
tSTART = CPOR  
×
0.12 × CPOR (µF)  
(1)  
must be selected to ensure that  
FILTER  
ICPOR  
, exceeds the time  
OCSLOW  
where the start-up delay timer threshold (V  
) is 0.3V,  
) is 2.5µA. See  
needed for the output to reach its final value. For example,  
given a MOSFET with an input capacitance C = C =  
GATE  
START  
and the Power-On Reset timer current (I  
CPOR  
ISS  
Table 2 for some typical supply contact start-up delays using  
2000pF, C  
is 1000µF, and I  
is set to 5A with a 12V  
LOAD  
LIM  
several standard value capacitors. As each GATE voltage  
input, then the load capacitance dominates as determined by  
continues ramping toward its final value (V  
+ V ) at a  
the calculated INRUSH > I . Therefore, the output voltage  
CC  
GS  
LIM  
defined slew rate (See Load Capacitance/Gate Capacitance  
Dominated Start-Up sections), a second CPOR timing cycle  
begins if: 1)/FAULT is high and 2)CFILTER is low (i.e., not an  
overvoltage, undervoltage lockout, or overcurrent state).  
slew rate determined from Equation 4 is:  
5A  
V
Output Voltage Slew Rate, (dVOUT/dt) =  
= 5  
100µF  
ms  
March 2005  
15  
MIC2584/2585