欢迎访问ic37.com |
会员登录 免费注册
发布采购

CPC7591BATR 参数 Datasheet PDF下载

CPC7591BATR图片预览
型号: CPC7591BATR
PDF下载: 下载PDF文件 查看货源
内容描述: 线卡接入交换机 [Line Card Access Switch]
分类和应用: 电信集成电路光电二极管
文件页数/大小: 19 页 / 551 K
品牌: CLARE [ CLARE ]
 浏览型号CPC7591BATR的Datasheet PDF文件第7页浏览型号CPC7591BATR的Datasheet PDF文件第8页浏览型号CPC7591BATR的Datasheet PDF文件第9页浏览型号CPC7591BATR的Datasheet PDF文件第10页浏览型号CPC7591BATR的Datasheet PDF文件第12页浏览型号CPC7591BATR的Datasheet PDF文件第13页浏览型号CPC7591BATR的Datasheet PDF文件第14页浏览型号CPC7591BATR的Datasheet PDF文件第15页  
CPC7591  
2.2.2 Hot Plug and Power Up Circuit Design  
Considerations  
2.3 Switch Logic  
2.3.1 Start-up  
There are six possible start up scenarios that can  
occur during power up. They are:  
The CPC7591 uses smart logic to monitor the V  
DD  
supply. Any time the V is below an internally set  
DD  
1. All inputs defined at power up & LATCH = 0  
2. All inputs defined at power up & LATCH = 1  
3. All inputs defined at power up & LATCH = Z  
4. All inputs not defined at power up & LATCH = 0  
5. All inputs not defined at power up & LATCH = 1  
6. All inputs not defined at power up & LATCH = Z  
threshold, the smart logic places the control logic to  
the all-off state. An internal pullup on the LATCH pin  
locks the CPC7591 in the all-off state following  
start-up until the LATCH pin is pulled down to a logic  
low. Prior to the assertion of a logic low at the LATCH  
pin, the switch control inputs must be properly  
conditioned.  
Under all of the start up situations listed above the  
CPC7591 will hold all of it’s switches in the all-off state  
2.3.2 Switch Timing  
during power up. When V requirements have been  
DD  
The CPC7591 provides, when switching from the  
ringing state to the talk state, the ability to control the  
release timing of the ringing switches SW3 and SW4  
relative to the state of the break switches SW1 and  
SW2 using simple TTL logic-level inputs. The two  
available techniques are referred to as  
satisfied the LCAS will complete it’s start up procedure  
in one of three conditions.  
For start up scenario 1 the CPC7591 will transition  
from the all-off state to the state defined by the inputs  
when V is valid.  
DD  
make-before-break and break-before-make operation.  
When the switch contacts of SW1 and SW2 are closed  
(made) before the ringing switch contacts of SW3 and  
SW4 are opened (broken), this is referred to as  
make-before-break operation. Break-before-make  
operation occurs when the ringing contacts of SW3  
and SW4 are opened (broken) before the switch  
contacts of SW1 and SW2 are closed (made). With  
the CPC7591, make-before-break and  
For start up scenarios 2, 3, 5, and 6 the CPC7591 will  
power up in the all-off state and remain there until the  
LATCH pin is pulled low. This allows for an indefinite  
all-off state for boards inserted into a powered system  
but are not configured for service or boards that need  
to wait for other devices to be configured first.  
Start up scenario 4 will start up with all switches in the  
break-before-make operations can easily be  
accomplished by applying the proper sequence of TTL  
logic-level inputs to the device.  
all-off state but upon the acceptance of a valid V the  
DD  
LCAS will revert to either the talk state or the ringing  
state and there after may randomly change states  
based on input pin leakage currents and loading.  
Because the LCAS state after power up can not be  
predicted with this start up condition it should never be  
utilized.  
2.3.3 Make-Before-Break Operation  
To use make-before-break operation, change the logic  
inputs from the ringing state directly to the talk state.  
Application of the talk state opens the ringing return  
switch, SW3, as the break switches SW1 and SW2  
close. The ringing switch, SW4, remains closed until  
the next zero-crossing of the ringing current. While in  
the make-before-break state, ringing potentials in  
excess of the CPC7591 protection circuitry thresholds  
will be diverted away from the SLIC. This operational  
sequence is shown below in the “Make-Before-Break  
Ringing to Talk Transition Logic Sequence” on page 12.  
On designs that do not wish to individually control the  
LATCH pins of multiple-port cards it is possible to bus  
many (or all) of the LATCH pins together to create a  
single board level input enable control.  
R05  
www.clare.com  
11  
 复制成功!