欢迎访问ic37.com |
会员登录 免费注册
发布采购

5962-0421901QUA 参数 Datasheet PDF下载

5962-0421901QUA图片预览
型号: 5962-0421901QUA
PDF下载: 下载PDF文件 查看货源
内容描述: [Field Programmable Gate Array, 250000 Gates, CMOS, CPGA624, CERAMIC, CGA-624]
分类和应用: 可编程逻辑
文件页数/大小: 217 页 / 1554 K
品牌: ACTEL [ Actel Corporation ]
 浏览型号5962-0421901QUA的Datasheet PDF文件第144页浏览型号5962-0421901QUA的Datasheet PDF文件第145页浏览型号5962-0421901QUA的Datasheet PDF文件第146页浏览型号5962-0421901QUA的Datasheet PDF文件第147页浏览型号5962-0421901QUA的Datasheet PDF文件第149页浏览型号5962-0421901QUA的Datasheet PDF文件第150页浏览型号5962-0421901QUA的Datasheet PDF文件第151页浏览型号5962-0421901QUA的Datasheet PDF文件第152页  
MIL-PRF-38535K  
APPENDIX F  
F.4.5.1 Visual examination of encapsulant. Visual inspection of the applied encapsulant post-cure is required.  
Sample size and accept/reject limits shall be documented and determined by the manufacturer, and, at a minimum,  
address the following areas:  
a. Cracks.  
b. Voids.  
c. Lack of interfacial adhesion.  
d. Poor uniformity.  
e. Stress on underlying layers.  
f.  
Coverage of desired area.  
F.4.6 Screening. One hundred percent screening shall be performed in accordance with TM 5004 of  
MIL-STD-883, with the following deletions and additions:  
F.4.6.1 Optional internal visual. An optional internal visual examination may be performed prior to bump utilizing  
applicable criteria within TM 2010 of MIL-STD-883 or manufacturer's internal criteria in order to screen die defects.  
Sample size and accept/reject criteria shall be determined and documented by the manufacturer.  
F.4.6.2 Internal visual screen. One hundred percent internal visual examination shall be performed prior to  
encapsulant utilizing applicable criteria within TM 2010 of MIL-STD-883 to screen die defects. At the manufacturer's  
option, bump visual and ILB visual may be combined with this internal visual examination provided 100 percent of the  
product is examined.  
F.4.6.3 Temperature cycle. One hundred percent temperature cycle shall be performed in accordance with TM  
1010 of MIL-STD-883, test condition C.  
F.4.6.4 Burn-in. One hundred percent pre, interim, and post burn-in electrical test shall be performed in  
accordance with the device specification. One hundred percent burn-in shall be performed in accordance with TM  
1015 of MIL-STD-883.  
F.4.6.5 Percent defective allowable (PDA) . PDA shall be calculated in accordance with TM 5004 of MIL-STD-883.  
F.4.6.6 External visual. One hundred percent external visual examination shall be performed in accordance with  
TM 2009 of MIL-STD-883 or manufacturer's applicable external criteria.  
F.4.7 Quality conformance inspection (QCI) . QCI shall be performed in accordance with TM 5005 of  
MIL-STD-883 with the following deletions and additions:  
F.4.7.1 Group A inspection. Group A inspection shall be in accordance with TM 5005 of MIL-STD-883 and the  
applicable device specification.  
F.4.7.2 Group B inspection. Group B inspection shall be in accordance with the following:  
F.4.7.2.1 Resistance to solvents. Resistance to solvents (TM 2015 of MIL-STD-883) shall be performed when ink  
marking is utilized. Sample size shall be in accordance with TM 5005 of MIL-STD-883.  
F.4.7.2.2 Attachability. Attachability of the outer lead bond shall be assured as documented in the device  
specification and shall include sample size and accept/reject limits.  
134  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 复制成功!