欢迎访问ic37.com |
会员登录 免费注册
发布采购

5962-0421901QUA 参数 Datasheet PDF下载

5962-0421901QUA图片预览
型号: 5962-0421901QUA
PDF下载: 下载PDF文件 查看货源
内容描述: [Field Programmable Gate Array, 250000 Gates, CMOS, CPGA624, CERAMIC, CGA-624]
分类和应用: 可编程逻辑
文件页数/大小: 217 页 / 1554 K
品牌: ACTEL [ Actel Corporation ]
 浏览型号5962-0421901QUA的Datasheet PDF文件第99页浏览型号5962-0421901QUA的Datasheet PDF文件第100页浏览型号5962-0421901QUA的Datasheet PDF文件第101页浏览型号5962-0421901QUA的Datasheet PDF文件第102页浏览型号5962-0421901QUA的Datasheet PDF文件第104页浏览型号5962-0421901QUA的Datasheet PDF文件第105页浏览型号5962-0421901QUA的Datasheet PDF文件第106页浏览型号5962-0421901QUA的Datasheet PDF文件第107页  
MIL-PRF-38535K  
APPENDIX A  
A.4.8.1.1 Design, processing, manufacturing, and testing instructions. The manufacturer shall have in effect  
documented instructions covering, as a minimum, these areas:  
a. Conversion of customer requirements into manufacturer's internal instructions (see A.4.8.1.1.1).  
b. Personnel training and testing (see A.4.8.1.1.2).  
c. Inspection of incoming materials, utilities, and work in-process (see A.4.8.1.1.3).  
d. Quality-control operations (see A.4.8.1.1.4).  
e. Quality-assurance operations (see A.4.8.1.1.5).  
f. Design, processing, manufacturing equipment, and materials instructions (see A.4.8.1.1.6).  
g. Cleanliness and atmosphere control in work areas (see A.4.8.1.1.7).  
h. Design, material, and process change control (see A.4.8.1.1.8).  
i. Tool, gauge, and test equipment maintenance and calibration (see A.4.8.1.1.9).  
j. Failure and defect analysis and feedback (see A.4.8.1.1.10).  
k. Corrective action and evaluation (see A.4.8.1.1.11).  
l. Incoming, in-process, and outgoing inventory control (see A.4.8.1.1.12).  
m. Schematics (see A.4.8.1.1.13).  
n. ESD handling control program (see A.4.8.1.1.14).  
Detailed requirements for coverage of these items are stated in A.4.8.1.1.1 through A.4.8.1.1.14. These  
requirements shall normally be expected to be met by the manufacturer's standard drawings, specifications, process  
instructions, and other established manufacturing practices. If particular requirements are not covered by the  
manufacturer's established practices, suitable documentation shall be added to satisfy those requirements.  
A.4.8.1.1.1 Conversion of customer requirements into manufacturer's internal instructions. The procedure by  
which customer requirements, as expressed in specifications, orders, etc., are converted into working instructions for  
the manufacturer's personnel shall be documented.  
A.4.8.1.1.2 Personnel training and testing. The motivational and work training and testing practices employed to  
establish, evaluate, and maintain the skills of personnel engaged in reliability-critical work shall be documented as to  
form, content, and frequency of use.  
A.4.8.1.1.3 Inspection of incoming materials and utilities, and of work in-process. Inspection operations shall be  
documented as to type of inspection, sampling and test procedures, acceptance rejection criteria, and frequency of  
use.  
A.4.8.1.1.4 Quality control operations. Quality control operations shall be documented as to type, procedures,  
rating criteria, action criteria, records, and frequency of use.  
A.4.8.1.1.5 Quality assurance operations. Quality assurance operations shall be documented as to type,  
procedures, equipment, judgment and action criteria, records, and frequency of use.  
89  
 
 
 
 
 
 
 
 
 
 
 
 复制成功!