欢迎访问ic37.com |
会员登录 免费注册
发布采购

5962-0422104QUC 参数 Datasheet PDF下载

5962-0422104QUC图片预览
型号: 5962-0422104QUC
PDF下载: 下载PDF文件 查看货源
内容描述: [Field Programmable Gate Array, 2000000 Gates, 32256-Cell, CMOS, CQFP256, CERAMIC, QFP-256]
分类和应用: 可编程逻辑
文件页数/大小: 217 页 / 1554 K
品牌: ACTEL [ Actel Corporation ]
 浏览型号5962-0422104QUC的Datasheet PDF文件第117页浏览型号5962-0422104QUC的Datasheet PDF文件第118页浏览型号5962-0422104QUC的Datasheet PDF文件第119页浏览型号5962-0422104QUC的Datasheet PDF文件第120页浏览型号5962-0422104QUC的Datasheet PDF文件第122页浏览型号5962-0422104QUC的Datasheet PDF文件第123页浏览型号5962-0422104QUC的Datasheet PDF文件第124页浏览型号5962-0422104QUC的Datasheet PDF文件第125页  
MIL-PRF-38535K  
APPENDIX B  
b. Table IV, group C or group B, Subgroup 5 life test requirements shall be met using one of the procedures below.  
(1) Life test may be performed on a quantity (accept) criteria of 22(0) for 2000 hours at 125°C or equivalent per TM  
1005 to attain 44,000 device hours. For lots greater than 200, actual devices shall be used. For lots less than or  
equal to 200, the number of actual devices shall be the greater of 5 devices or 10 percent of the lot, and the SEC  
shall supplement actual devices to result in a sample of 22 unless acceptable group C data from the same lot of  
SEC is available for the previous 3 months. The SEC shall have been produced under equivalent conditions as  
the production lot and as close in time as feasible, but not to exceed a 3 month period.  
Note: For ASICs, a sample size of 5 actual devices may be used with the balance being made up of the SEC.  
(2) Group C life tests shall be performed on the initial production lot of actual devices from each wafer lot, in  
accordance with table IV herein. Group C life tests are not required to be performed on subsequent production  
lots when all the following conditions are met:  
(a) Subsequent production lots utilize die from the same wafer lot as the initial production lot.  
(b) Wafers or die remaining from the initial production lot are to be stored in dry nitrogen or equivalent controlled  
storage, and in covered containers.  
(c ) No major changes to the assembly processes have occurred since the group C test was performed on the  
wafer lot.  
c. Table V, group D test requirements for package technology style characterization testing (see table H-IIX), and group D  
testing on the initial production lot utilizing the package family of interest, shall be in accordance with MIL-PRF-38535 and  
the manufacturer’s approved QM plan. A package family consists of a set of package types with the same package  
configuration (e.g., BGA, CGA), material type (e.g., alumina, beryllium oxide (BeO)), package construction techniques (e.g.,  
single layer, multilayer), ball (bumps) and column spacing with identical package assembly techniques (e.g., material and  
type of seal, ball attach, underfill, solder bumps or wire bond method and wire size, die attach method and material). All  
new alternate sources of package elements shall be qualified to the applicable group D tests and shall meet paragraph  
H.3.4.4.1.  
d. Group E inspection shall be performed in accordance with table C-I of appendix C. Metal oxide semiconductor (MOS)  
microcircuits, when specified, shall be tested for time dependent effects post total dose irradiation. When 100 percent latch-  
up screen is specified, the PDA shall be 5 percent or one device, whichever is greater. The devices used for group E testing  
shall pass the specified group A electrical tests. An alternate procedure to table C-I group E test may be used upon  
approval of the qualifying activity.  
107  
 复制成功!