欢迎访问ic37.com |
会员登录 免费注册
发布采购

5962-0151801QYC 参数 Datasheet PDF下载

5962-0151801QYC图片预览
型号: 5962-0151801QYC
PDF下载: 下载PDF文件 查看货源
内容描述: [Field Programmable Gate Array, 32000 Gates, 206MHz, 2880-Cell, CMOS, CQFP208, CERAMIC, QFP-208]
分类和应用: 可编程逻辑
文件页数/大小: 217 页 / 1554 K
品牌: ACTEL [ Actel Corporation ]
 浏览型号5962-0151801QYC的Datasheet PDF文件第66页浏览型号5962-0151801QYC的Datasheet PDF文件第67页浏览型号5962-0151801QYC的Datasheet PDF文件第68页浏览型号5962-0151801QYC的Datasheet PDF文件第69页浏览型号5962-0151801QYC的Datasheet PDF文件第71页浏览型号5962-0151801QYC的Datasheet PDF文件第72页浏览型号5962-0151801QYC的Datasheet PDF文件第73页浏览型号5962-0151801QYC的Datasheet PDF文件第74页  
MIL-PRF-38535K  
APPENDIX A  
A.3.4 Quality assurance requirements. The quality assurance provisions provided in this appendix are intended to  
provide a compliant MIL-STD-883 class level B or level S device (see A.3.1.3.34 and A.3.1.3.35). Devices or lots  
which have failed to pass any tests applied or acceptance criterion (PDA) shall not be downgraded to any lower  
quality assurance level even though that test or criterion may not be a requirement of the lower level (a failed device  
or lot shall not be accepted). Where shown, method references are in accordance with MIL-STD-883.  
A.3.4.1 Qualification. The manufacturer supplying devices in compliance to this appendix shall perform sufficient  
product qualification testing to assure the devices supplied meet the minimum class level B or S performance  
requirements as described herein. The manufacturer shall maintain documentation of qualification testing for review  
of the preparing or acquiring activity upon request.  
A.3.4.1.1 Compliance validation. Although on-site audits are not a condition to begin supplying under the  
requirements of this appendix, all manufacturers supplying in compliance to this appendix are subject to periodic  
Government compliance validation audits on a drop-in basis with a minimum of notice.  
A.3.4.1.2 Process monitor programs. Process monitor programs performed by the manufacturer shall be  
established as a minimum for the following processes: Scanning Electron Microscope (SEM), wire bonding, die  
attachment, lid seal, particle detection, lead trimming, and final lead finish thickness. The implementing procedures  
shall provide for frequency, sample size, reject criteria, allowable rework, and disposition of failed product/lot(s). With  
the exception of the particle detection monitor, a procedure is required for the traceability, recovery, and disposition of  
all units monitored since the last successful test. As with all monitors, the particle detection procedure shall provide  
for continual process improvement. Records of these monitors and procedures shall be maintained and available for  
review.  
A.3.4.1.2.1 Inspection by scanning electron microscope (SEM). A continuing SEM program shall be established to  
ensure adequate process control and coverage of metallization at oxide steps, contact openings, and general  
metallization. A monthly (minimum frequency) SEM evaluation shall be performed on product that is in the  
manufacturing process. The SEM program shall establish routine control over metallization processes by process  
families or inspection of products.  
A.3.4.1.2.2 Wire bonding. The manufacturer shall monitor the wire bond strength in accordance with the  
manufacturer's documented procedure. The frequency of this procedure shall be performed at machine setup and at  
the end of the production run as a minimum. At the manufacturer's option, this procedure shall consider shift start  
and stop, change of operators, spools, packages, wire size, lot size, and other related factors.  
A.3.4.1.2.3 Die attachment. The manufacturer shall monitor the die attachment integrity in accordance with the  
manufacturer's documented procedure. This procedure shall be performed at each equipment setup and at the end  
of the production run as a minimum. At the manufacture's option, this procedure shall consider other related factors.  
A.3.4.1.2.4 Lid seal. The manufacturer shall monitor, as a minimum, glass frit packages for seal integrity in  
accordance with the manufacturer's documented procedure. A sample and test plan shall be available for review by  
the qualifying or preparing activity.  
A.3.4.1.2.5 Particle detection. The manufacturer shall establish a particle detection monitoring program which  
assesses the particle contamination of sealed devices on an individual manufacturing line basis. The monitor shall  
have provisions for testing in accordance with TM 2020, condition A of MIL-STD-883. JEP114, "Guidelines for  
Particle Impact Noise Detection (PIND) Testing, Operator Training and Certification" may be used as a guideline.  
Suitable data for each manufacturing line shall be used to establish an appropriate need, sample size, and sampling  
frequency for each package family. Unless otherwise approved by the qualifying activity (QA), the minimum sampling  
frequency of those devices in production shall be once each month per package family. Investigative and corrective  
actions shall be established which address noted deficiencies. Records of this monitor shall be made available for  
review and shall represent at least the six-month period preceding the audit.  
56