Dimension Diagram Unit: mm (inch)
Gigabit Power Injector Block Diagram
Description of LED Functions for Gigabit Power Injector
Power-up Sequence:
Upon power-up, all 3 LEDs will light for 2 seconds, as part of the self-test for the internal
microprocessor software. After the end of the 2 seconds, the "ON" LED will illuminate
green, signifying that the DC output voltage is available for powering a compliant load
(to the 802.3at PoE standards).
Detection Sequence:
Once a compliant load is attached to the output RJ45 connector, the green "CONNECT"
LED will illuminate. Should the load is classified as Class 4 PD, the green “PoEPLUS”
LED will illuminate. Otherwise, “PoEPLUS” LED will stay off.
Should the load be non-compliant then the LEDs will blink a code signifying the cause
for non-detection.