欢迎访问ic37.com |
会员登录 免费注册
发布采购

MD56V62320K-6TAZ03 参数 Datasheet PDF下载

MD56V62320K-6TAZ03图片预览
型号: MD56V62320K-6TAZ03
PDF下载: 下载PDF文件 查看货源
内容描述: [Synchronous DRAM, 2MX32, 5.4ns, CMOS, PDSO86, 0.400 INCH, 0.80 MM PITCH, LEAD FREE, PLASTIC, TSOP2-86]
分类和应用: 动态存储器光电二极管
文件页数/大小: 37 页 / 395 K
品牌: OKI [ OKI ELECTRONIC COMPONETS ]
 浏览型号MD56V62320K-6TAZ03的Datasheet PDF文件第3页浏览型号MD56V62320K-6TAZ03的Datasheet PDF文件第4页浏览型号MD56V62320K-6TAZ03的Datasheet PDF文件第5页浏览型号MD56V62320K-6TAZ03的Datasheet PDF文件第6页浏览型号MD56V62320K-6TAZ03的Datasheet PDF文件第8页浏览型号MD56V62320K-6TAZ03的Datasheet PDF文件第9页浏览型号MD56V62320K-6TAZ03的Datasheet PDF文件第10页浏览型号MD56V62320K-6TAZ03的Datasheet PDF文件第11页  
PEDD56V62320K-01  
OKI Semiconductor  
MD56V62320K  
DC Characteristics(1/2)  
MD56V62320  
K-6TAZ03 K-7TAZ03  
Condition  
Parameter  
Symbol  
Unit Note  
Bank  
CKE  
Others  
Min.  
Max.  
Min.  
Max.  
Output High  
Voltage  
I
=
OH  
V
2.4  
2.4  
V
V
OH  
2.0mA  
Output Low  
Voltage  
I
=
OL  
V
I
0.4  
10  
10  
0.4  
10  
10  
OL  
LI  
2.0mA  
Input Leakage  
Current  
10  
10  
10  
10  
µA  
µA  
Output Leakage  
Current  
I
LO  
Average Power  
Supply Current  
t
t
= Min.  
= Min.  
CC  
RC  
One Bank  
Active  
I
I
CKE VIH  
CKE VIH  
120  
50  
100  
40  
mA  
mA  
1,2  
3
CC1  
CC2  
No Burst  
(Operating)  
Power Supply  
Current  
Both  
Banks  
Precharge  
t
t
= Min.  
= Min.  
CC  
CC  
(Standby)  
Average Power  
Supply Current  
Both  
Banks  
Active  
I
CKE VIL  
3
3
mA  
2
CC3S  
(Clock  
Suspension)  
Average Power  
Supply Current  
One Bank  
Active  
I
I
I
I
I
CKE VIH  
CKE VIH  
CKE VIH  
CKEVIL  
CKE VIL  
t
t
= Min.  
= Min.  
50  
160  
120  
2
45  
140  
100  
2
mA  
mA  
mA  
mA  
mA  
3
1,2  
2
CC3  
CC4  
CC5  
CC6  
CC7  
CC  
CC  
(Active Standby)  
Both  
Banks  
Active  
Power Supply  
Current (Burst)  
Power Supply  
Current  
One Bank  
Active  
t
t
= Min.  
= Min.  
CC  
RC  
(Auto-Refresh)  
Average Power  
Supply Current  
Both  
Banks  
Precharge  
t
t
= Min.  
= Min.  
CC  
CC  
(Self-Refresh)  
Average Power  
Supply Current  
Both  
Banks  
2
2
Precharge  
(Power Down)  
Notes: 1. Measured with outputs open.  
2. The address and data can be changed once or left unchanged during one cycle.  
3. The address and data can be changed once or left unchanged during two cycles.  
7/37