欢迎访问ic37.com |
会员登录 免费注册
发布采购

71M6521BE 参数 Datasheet PDF下载

71M6521BE图片预览
型号: 71M6521BE
PDF下载: 下载PDF文件 查看货源
内容描述: 电能计量IC [Energy Meter IC]
分类和应用:
文件页数/大小: 97 页 / 1586 K
品牌: TERIDIAN [ TERIDIAN SEMICONDUCTOR CORPORATION ]
 浏览型号71M6521BE的Datasheet PDF文件第61页浏览型号71M6521BE的Datasheet PDF文件第62页浏览型号71M6521BE的Datasheet PDF文件第63页浏览型号71M6521BE的Datasheet PDF文件第64页浏览型号71M6521BE的Datasheet PDF文件第66页浏览型号71M6521BE的Datasheet PDF文件第67页浏览型号71M6521BE的Datasheet PDF文件第68页浏览型号71M6521BE的Datasheet PDF文件第69页  
71M6521BE  
Energy Meter IC  
DATA SHEET  
JANUARY 2008  
V3P3SYS  
R1  
71M6521BE  
10k  
100pF  
OPT_RX  
Phototransistor  
V3P3SYS  
LED  
R2  
OPT_TX  
Figure 34: Connection for Optical Components  
Connecting V1 and Reset Pins  
A voltage divider should be used to establish that V1 is in a safe range when the meter is in mission mode (V1 must be lower  
than 2.9V in all cases in order to keep the hardware watchdog timer enabled). For proper debugging or loading code into the  
71M6521BE mounted on a PCB, it is necessary to have a provision like the header shown above R1 in Figure 35. A shorting  
jumper on this header pulls V1 up to V3P3 disabling the hardware watchdog timer.  
The parallel impedance of R1 and R2 should be approximately 20 to 30kΩ in order to provide hysteresis for the power fault  
monitor.  
R1  
R3  
V3P3  
GND  
5k  
V1  
C1  
100pF  
R2  
Figure 35: Voltage Divider for V1  
Even though a functional meter will not necessarily need a reset switch, it is useful to have a reset pushbutton for prototyping,  
as shown in Figure 36, left side. The RESET signal may be sourced from V3P3SYS (functional in MISSION mode only),  
V3P3D (MISSION and BROWNOUT modes), VBAT (all modes, if battery is present), or from a combination of these sources,  
depending on the application. When the 71M6521BE is used in an EMI environment, the RESET pin should be protected by  
the external components shown in Figure 36, right side. R1 should be in the range of 100Ω and mounted as closely as possible  
to the IC.  
Since the 71M6521BE generates its own power-on reset, a reset button or circuitry, as shown in Figure 36, left side, is  
only required for test units and prototypes.  
V1.0  
© 2005-2008 TERIDIAN Semiconductor Corporation  
Page: 65 of 97