欢迎访问ic37.com |
会员登录 免费注册
发布采购

PM9904BPD 参数 Datasheet PDF下载

PM9904BPD图片预览
型号: PM9904BPD
PDF下载: 下载PDF文件 查看货源
内容描述: 评估板为SA9904B电能计量IC [Evaluation Board for the SA9904B Energy Metering IC]
分类和应用:
文件页数/大小: 22 页 / 4347 K
品牌: SAMES [ SAMES ]
 浏览型号PM9904BPD的Datasheet PDF文件第1页浏览型号PM9904BPD的Datasheet PDF文件第2页浏览型号PM9904BPD的Datasheet PDF文件第4页浏览型号PM9904BPD的Datasheet PDF文件第5页浏览型号PM9904BPD的Datasheet PDF文件第6页浏览型号PM9904BPD的Datasheet PDF文件第7页浏览型号PM9904BPD的Datasheet PDF文件第8页浏览型号PM9904BPD的Datasheet PDF文件第9页  
PM9904BPD  
ssaammeess  
CONNECTOR DESCRIPTION  
SETTING UP THE PM9904AP MODULE  
Figure 3 below shows a typical setup for the PM9904BPD  
evaluation module. The three phase voltages are connected  
directly to SK1 and each corresponding phase current is wired  
through the on-board CT’s. An external power supply can be  
connected to SK3 should the PC’s parallel port not be able to  
source enough current for the module's opto-couplers.  
Jumper  
Description  
Connects the three phase 4 wire supply to the  
module.  
SK1  
Female BD25pin connects the evaluation board to  
the PC parallel port by a 1 to 1 cable. The module  
is isolated from the PC by the opto-couplers.  
SK2  
5V supply to U7 opto coupler  
Figure 3 also shows the default jumper settings. The  
PM9904BPD evaluation module is setup by default for 3x  
230V/80A operation. For 3x 115V operation jumpers J1, J2  
and J3 need to be closed. Also capacitors C12, C13, and C14  
values must be changed to 1uF / 150 VAC.  
SK3  
JP1  
This header strip can be used for measuring the  
I/O pins of the SA9904B and SA8807. Note that  
this connector is on the same potential as the  
SA9904B. Provision is made for VDD and VSS  
so that a board with a micro controller can be  
easily fitted without any additional wiring. Signals  
available on this connector are:  
When these hardware settings have been verified the user has  
the choice of using the micro-controller board or a PC to  
evaluate the SA9904B further.Please note when using the PC  
the micro-controller board should be unplugged to prevent a  
bus contention on the SPI bus, since the PC and micro-  
controller would be attempting to drive the bus simultaneously.  
Pin number Signal SA9904 (U1) SA8807 (U2)  
1
2
3
4
5
6
7
8
VDD  
VSS  
F50  
Pin 6  
Pin 14  
Pin 7  
Pin 8  
Pin 13  
Pin 9  
Pin 12  
NC  
Pin 13  
Pin 26  
NC  
Micro-controller board  
Once the board has been plugged into the evaluation module  
no further action is required, just apply power.  
SCK  
CS  
Pin 18  
NC  
MISO  
MOSI  
CE  
Pin 20  
Pin 19  
Pin 21  
PC  
After removing the micro-controller board the evaluation board  
can connected to the PC’s parallel port using a 1 to 1 parallel  
cable (not supplied). Once the evaluation board has been  
connected to the PC and powered up, the supplied software  
can be launched. Refer to the next section for the software  
installation and setup details.  
MISO - Master In Slave Out  
MOSI - Master Out Slave In  
N
Load  
PH1  
PH2  
PH3  
SK1  
5V  
CT3  
CT2  
CT1  
JP4  
J3  
J2  
J1  
Supp Sel  
J7  
J12  
PB/F150  
J6  
JP1  
GND  
J5  
J8  
J9  
VSS  
To PC  
Parallel port  
J4  
J10  
J11  
VDD  
SK2  
Figure 3: PM9904AP setup and connection  
3/22  
http://www.sames.co.za