欢迎访问ic37.com |
会员登录 免费注册
发布采购

EPR-91 参数 Datasheet PDF下载

EPR-91图片预览
型号: EPR-91
PDF下载: 下载PDF文件 查看货源
内容描述: 使用12 W电源供应器 - 为EP- 91工程原型报告 [Engineering Prototype Report for EP-91 - 12 W Power Supply using]
分类和应用:
文件页数/大小: 36 页 / 713 K
品牌: POWERINT [ Power Integrations ]
 浏览型号EPR-91的Datasheet PDF文件第11页浏览型号EPR-91的Datasheet PDF文件第12页浏览型号EPR-91的Datasheet PDF文件第13页浏览型号EPR-91的Datasheet PDF文件第14页浏览型号EPR-91的Datasheet PDF文件第16页浏览型号EPR-91的Datasheet PDF文件第17页浏览型号EPR-91的Datasheet PDF文件第18页浏览型号EPR-91的Datasheet PDF文件第19页  
7-Feb-2006  
EP-91 12 V, 1 A, Universal Input Supply  
7.5 Transformer Construction  
Bobbin Set Up  
Orientation  
Set up the bobbin with its pins oriented to the left hand side.  
Margin Tape  
Apply 2.0 mm margin at the pin side of bobbin using item [6]. Match  
combined height of shield, primary, and bias windings.  
Start at Pin 1. Wind 14 bifilar turns of item [3] from left to right. Wind with  
tight tension across entire bobbin evenly. Cut the ends of the bifilar and  
leave floating.  
WD1  
Cancellation Winding  
Insulation  
1 Layer of tape [7] for insulation.  
WD#2  
Primary winding  
Start at pin 3. Wind 28 turns of item [3] from left to right. Apply 1 Layer of  
tape [7] for insulation. Wind another 28 turns from right to left. Wind with  
tight tension across entire bobbin evenly. Finish at Pin 1.  
1 Layer of tape [7] for insulation.  
Insulation  
WD #3  
Bias Winding  
Start at Pin 4, wind 6 trifilar turns of item [5]. Wind from left to right with  
tight tension. Wind uniformly, in a single layer across entire width of  
bobbin. Finish on Pin 2.  
Insulation  
1 Layer of tape [7] for insulation.  
WD #4  
Bias Winding  
Start at Pin 2, wind 6 trifilar turns of item [5] from left to right with tight  
tension. Wind uniformly, in a single layer across entire width of bobbin.  
Finish on Pin 5.  
Insulation  
1 Layer of tape [8] for insulation.  
Margin Tape  
Apply 2.0 mm margin at the pin side of bobbin using item [6]. Match  
combined height of secondary windings.  
WD #5  
Secondary Winding  
Start at Pin 8, wind 7 turns of item [5] from left to right. Wind uniformly, in  
a single layer across entire bobbin evenly. Finish on Pin 6.  
3 Layers of tape [8] for insulation.  
Assemble and secure core halves using item [1] and item [9]  
Dip varnish using item [10] (do not vacuum impregnate)  
Outer Insulation  
Core Assembly  
Varnish  
Power Integrations  
Tel: +1 408 414 9200 Fax: +1 408 414 9201  
www.powerint.com  
Page 15 of 36  
 复制成功!