欢迎访问ic37.com |
会员登录 免费注册
发布采购

13892_11 参数 Datasheet PDF下载

13892_11图片预览
型号: 13892_11
PDF下载: 下载PDF文件 查看货源
内容描述: 电源管理和用户接口IC [Power Management and User Interface IC]
分类和应用:
文件页数/大小: 156 页 / 5573 K
品牌: FREESCALE [ Freescale ]
 浏览型号13892_11的Datasheet PDF文件第58页浏览型号13892_11的Datasheet PDF文件第59页浏览型号13892_11的Datasheet PDF文件第60页浏览型号13892_11的Datasheet PDF文件第61页浏览型号13892_11的Datasheet PDF文件第63页浏览型号13892_11的Datasheet PDF文件第64页浏览型号13892_11的Datasheet PDF文件第65页浏览型号13892_11的Datasheet PDF文件第66页  
FUNCTIONAL DEVICE OPERATION  
OPERATING MODES  
Table 25. Timer Main Characteristics  
Timer  
Duration  
Under-voltage Timer  
Reset Timer  
4.0 ms  
40 ms  
Watchdog Timer  
Power Cut Timer  
128 ms  
Programmable 0 to 8 seconds in 31.25 ms steps  
TIMING DIAGRAMS  
A Turn On event timing diagram example shows in Figure 12.  
Figure 12. Power Up Timing Diagram  
POWER UP  
At power up, switchers and regulators are sequentially enabled in time slots of 2.0 ms steps to limit the inrush current after an  
initial delay of 8.0 ms, in which the core circuitry gets enabled. To ensure a proper power up sequence, the outputs of the  
switchers are discharged at the beginning of a Cold Start. For that reason, an 8.0 ms delay allows the outputs of the linear  
regulators to be fully discharged as well through the built-in discharge path. Time slots which include multiple regulator startups  
will be sub-sequenced for additional inrush balancing. The peak inrush current per event is limited. Any under-voltage detection  
at BP is masked while the power up sequencer is running.  
The Power Up mode Select pins (PUMS1 and 2) are used to configure the startup characteristics of the regulators. Supply  
enabling and output level options are selected by hardwiring the PUMSx pins for the desired configuration. The state of the  
PUMSx pins can be read out via the sense bits PUMSSxx[1:0]. Tying the PUMSx pins to ground corresponds to 00, open to 01,  
VCOREDIG to 10, and VCORE to 11.  
The recommended power up strategy for end products is to bring up as little of the system as possible at booting, essentially  
sequestering just the bare essentials, to allow processor startup and software to run. With such a strategy, the startup transients  
are controlled at lower levels, and the rest of the system power tree can be brought up by software. This allows optimization of  
supply ordering where specific sequences may be required, as well as supply default values. Software code can load up all of  
the required programmable options to avoid sneak paths, under/over-voltage issues, startup surges, etc., without any change in  
hardware. For this reason, the Power Gate drivers are limited to activation by software rather than the sequencer, allowing the  
core(s) to startup before any peripheral loading is introduced.  
The power up defaults Table 26 shows the initial setup for the voltage level of the switchers and regulators, and whether they  
get enabled.  
13892  
Analog Integrated Circuit Device Data  
62  
Freescale Semiconductor  
 复制成功!