Crane Aerospace & Electronics Power Solutions
sLH sꢂꢄglꢃ ꢀꢄꢆ dꢇꢀl dc/dc cꢈꢄvꢃꢉꢊꢃꢉꢁ
28 VoLt input – 1.5 Watt – pendinꢋ reVision c reLease
Cl a s s
H
a n d K, MIl-PRF-38534 En v I R o n M E n t a l
sC R E E n I n g
end item-level test
perfOrmed
spaCe prOtOtype (O)
nOn-Qml1
Class h
Qml
Class K
Qml
2
3
Non-destruct bond pull
Method 2023
no
yes
yes
yes
Pre-cap Inspection
Method 2017, 2032
yes
yes
Temperature Cycle (10 times)
Method 1010, Cond. C, -65°C to 150°C, ambient
yes
yes
yes
yes
yes
yes
Constant Acceleration
Method 2001, 3000 g
PIND Test
Method 2020, Cond. A
3
no
yes
yes
yes
Pre burn-in test
yes
yes
Burn-in
Method 1015, 125°C case, typical
96 hours
160 hours
yes
no
no
no
yes
no
no
no
yes
2 x 160 hours (includes mid-BI test)
Final Electrical Test MIL-PRF-38534
Group A, Subgroups 1 through 6
-55°C, +25°C, +125°C case
yes
N/A
N/A
yes
N/A
N/A
yes
yes
Radiography
Method 2012
Post Radiography Electrical Test
Room temperature
3
yes
Hermeticity Test
Fine Leak, Method 1014, Cond. A
Gross Leak, Method 1014, Cond. C
yes
yes
yes
yes
yes
yes
Final visual inspection
Method 2009
yes
yes
yes
Test methods are referenced to MIL-STD-883 as determined by MIL-PRF-38534.
Notes:
1. Space Prototype (O), non-QML products, do not meet all of the requirements of MIL-PRF-38534.
2. Not applicable to EMI filters that have no wirebonds.
3. Not required by DSCC but performed to assure product quality.
www.interpoint.com
Page 9 of 10
Rev C - 20090318 - Pending Revision C Release