CPC7581  
2. Functional Description  
relevant ITU, LSSGR, TIA/EIA and IEC protection  
requirements.  
2.1 Introduction  
The CPC7581 has three states:  
The CPC7581 operates from a +5 V supply only. This  
gives the device extremely low idle and active power  
consumption and allows use with virtually any range of  
battery voltage. Battery voltage is also used by the  
CPC7581 as a reference for the integrated protection  
circuit. In the event of a loss of battery voltage, the  
CPC7581 enters the all-off state.  
Talk. Line break switches SW1 and SW2 closed,  
ringing switches SW3 and SW4 open.  
Ringing. Ringing switches SW3 and SW4 closed,  
line break switches SW1 and SW2 open.  
All-off. All switches open.  
See “Truth Table” on page 9 for more information.  
The CPC7581 offers break-before-make and  
make-before-break switching from the ringing state to  
the talk state with simple logic-level input control.  
Solid-state switch construction means no impulse  
noise is generated when switching during ring  
cadence or ring trip, eliminating the need for external  
zero-cross switching circuitry. State control is via  
logic-level input so no additional driver circuitry is  
required. The line break switches SW1 and SW2 are  
2.2 Switch Logic  
The CPC7581 provides, when switching from the  
ringing state to the talk state, the ability to control the  
release timing of the ringing switches SW3 and SW4  
relative to the state of the line break switches SW1  
and SW2 using simple logic-level input. This is called  
make-before-break or break-before-make operation.  
When the line break switch contacts (SW1 and SW2)  
are closed (or made) before the ringing switch  
contacts (SW3 and SW4) are opened (or broken), this  
is called make-before-break operation.  
linear switches that have exceptionally low R and  
ON  
excellent matching characteristics. The ringing switch  
SW4 has a breakdown voltage rating of 465V @ 25°C.  
This is sufficiently high, with proper protection, to  
prevent breakdown in the presence of a transient fault  
condition (i.e., passing the transient on to the ringing  
generator).  
Break-before-make operation occurs when the ringing  
contacts (SW3 and SW4) are opened (broken) before  
the line break contacts (SW1 and SW2) are closed  
(made).  
Integrated into the CPC7581 is a over voltage  
clamping circuit, active current limiting, and a thermal  
shutdown mechanism to provide protection to the  
SLIC device during a fault condition. Positive and  
negative surges are reduced by the current limiting  
circuitry and hazardous potentials are steered to  
ground via diodes and, in CPC7581xA and  
CPC7581xC parts, an integrated SCR. Power-cross  
potentials are also reduced by the current limiting and  
thermal shutdown circuits.  
To use make-before-break ringing switch release  
timing, de-assert IN  
during ringing. This  
RINGING  
causes the operational sequence shown in “Make-  
Before-Break Operation Logic Table (Ringing to Talk  
Transition)” on page 11 to occur.  
To protect the CPC7581 from an overvoltage fault  
condition, the use of a secondary protector is required.  
The secondary protector must limit the voltage seen at  
the tip and ring terminals to a level below the  
maximum breakdown voltage of the switches. To  
minimize the stress on the solid-state contacts, use of  
a foldback or crowbar type secondary protector is  
recommended. With proper selection of the secondary  
protector, a line card using the CPC7581 will meet all  