欢迎访问ic37.com |
会员登录 免费注册
发布采购

U642B 参数 Datasheet PDF下载

U642B图片预览
型号: U642B
PDF下载: 下载PDF文件 查看货源
内容描述: Interval-和擦拭/清洗雨刮器控制IC [Interval- and Wipe/ Wash Wiper Control IC]
分类和应用:
文件页数/大小: 7 页 / 56 K
品牌: ATMEL [ ATMEL ]
 浏览型号U642B的Datasheet PDF文件第1页浏览型号U642B的Datasheet PDF文件第3页浏览型号U642B的Datasheet PDF文件第4页浏览型号U642B的Datasheet PDF文件第5页浏览型号U642B的Datasheet PDF文件第6页浏览型号U642B的Datasheet PDF文件第7页  
U642B  
Ordering Information  
Extended Type Number  
U642B  
Package  
DIP8  
Remarks  
U642B–FP  
SO8  
Pin Description  
Pin  
1
Symbol  
GND  
INT  
Function  
GND  
INT  
1
2
8
7
V
S
Ground  
2
Interval switch  
OUT  
3
C
R
Timing capacitor C  
t
t
2
U642B  
4
Afterwiping time resistance  
C
6
5
PARK  
3
4
t
5
WASH Wipe/Wash switch  
6
PARK  
OUT  
Park switch for wiper motor  
WASH  
R
t
7
Relay control output  
Supply voltage KI. 15  
93 7691  
8
V
S
Figure 2. Pinning  
Circuit Description  
at the capacitor is greater than 6.5 V, the relay is turned  
on as long as the switch ”WIWA” is closed.  
Interval Function, Pin 2  
By closing the interval switch, S , to supply voltage,  
2
The after-wipe-time begins after the switch is open  
whereas the sources D and F are switched off and the  
source E is activated. Source E discharges the capacitor  
till the voltage is less than 2.2 V. The relay is off and the  
wiper-motor is supplied via the park switch until the park  
position will be reached. The after-wipe-time is  
determined by the current source E which can be  
V , the relay is activated. The internal current source  
Batt  
(Pin 3) which holds the capacitor C in charged state is  
switched-off. As soon as there is a positive potential at the  
2
park switch (S ), the current source F (see figure 1)  
1
charges the capacitor C very fast. After the wiper  
2
operation is finished, S is again at ground potential, the  
1
relay is in ”off” position – interval pause begins – the  
regulated with the external resistor R  
. Afterwards the  
Time  
capacitor C is discharged through the current source C,  
2
source A discharges the capacitor. The relay switch off is  
till the voltage at Pin 3 is below the threshold of 2 V.  
Interval pause can be adjusted between 4 s to 20 s with the  
independent of the park switch S .  
1
help of potentiometer R . Now the relay switches on and  
3
the next interval cycle begins. Opening of switch S  
2
Interval and WIWA Functions  
causes the current source A to discharge C immediately  
2
The interval function is interrupted immediately when the  
wipe/ wash mode is activated. The current source A dis-  
charges the capacitor to a value of 2 V, afterwards the  
normal wash function starts.  
and current sources C and F are switched-off.  
Wipe/Wash (WIWA) Operation, Pin 5  
Interval wiping starts immediately when the after-wipe-  
time is over. The switching delays are slightly shorter,  
because the capacitor is already charged to a value of 2 V.  
By closing the WIWA-switch, S , to supply voltage,  
3
V , the water pump starts spraying water on the wind-  
Batt  
screen, the current source A is switched-off which keeps  
the capacitor C in discharged state. Now the capacitor is The wipe/ wash function is not interrupted when interval  
2
charged through the current sources D and F, and when af- switch S is activated. Interval function begins after the  
2
ter a time interval of approximately 100 ms, the voltage WIWA function is over.  
2 (7)  
Rev. A4, 10-Apr-01  
 复制成功!