欢迎访问ic37.com |
会员登录 免费注册
发布采购

AME5131AEEVADJZ 参数 Datasheet PDF下载

AME5131AEEVADJZ图片预览
型号: AME5131AEEVADJZ
PDF下载: 下载PDF文件 查看货源
内容描述: 低功耗DC / DC升压转换器 [Low Power DC/DC Boost Converter]
分类和应用: 转换器升压转换器
文件页数/大小: 11 页 / 104 K
品牌: AME [ ANALOG MICROELECTRONICS ]
 浏览型号AME5131AEEVADJZ的Datasheet PDF文件第2页浏览型号AME5131AEEVADJZ的Datasheet PDF文件第3页浏览型号AME5131AEEVADJZ的Datasheet PDF文件第4页浏览型号AME5131AEEVADJZ的Datasheet PDF文件第5页浏览型号AME5131AEEVADJZ的Datasheet PDF文件第7页浏览型号AME5131AEEVADJZ的Datasheet PDF文件第8页浏览型号AME5131AEEVADJZ的Datasheet PDF文件第9页浏览型号AME5131AEEVADJZ的Datasheet PDF文件第10页  
AME, Inc.  
Low Power  
DC/DC Boost Converter  
AME5131  
n Detailed Description  
Operation  
The AME5131 is a boost converter with a smart control  
scheme that operates in a pulse frequency modulation  
(PFM) with constant peak current control.  
The smart control schemes utilize a reference voltage,  
minimum off-time, maximum on-time and current-limited  
control scheme. The switch turns off as the inductor cur-  
rent reaches the internally set peak current of 400mA  
(typical). The second criteria that turns off the switch is  
the maximum on-time of 6ms (typical). As the switch is  
turned off the external Schottky diode is forward biased  
delivering the current to the output. The switch remains  
off for a minimum of 400 ns (typical), or until the feedback  
voltage drops below the reference voltage.  
Using this PFM peak current control scheme the con-  
verter operates in discontinuous conduction mode (DCM)  
where the switching frequency depends on the output  
current, which results in high efficiency over the entire  
load current range. This regulation scheme is inherently  
stable, allowing a wider selection range for the inductor  
and output capacitor.  
Soft-start  
Soft-start is provided on the AME5131 to minimize in-  
rush current. All inductive boost converters exhibit high  
inrush current during start-up if no special precaution is  
made. This can cause voltage drops at the input rail dur-  
ing start up and may result in an unwanted or early sys-  
tem shut down.  
The soft-start time is set by increasing the current limit  
in two steps starting from 100mA for 256 cycles to 200mA  
for the next 256 cycles, and then full current limit.  
6
 复制成功!