欢迎访问ic37.com |
会员登录 免费注册
发布采购

EPM240T100C5 参数 Datasheet PDF下载

EPM240T100C5图片预览
型号: EPM240T100C5
PDF下载: 下载PDF文件 查看货源
内容描述: [最大II器件]
分类和应用: 可编程逻辑器件输入元件PC
文件页数/大小: 295 页 / 3815 K
品牌: ALTERA [ ALTERA CORPORATION ]
 浏览型号EPM240T100C5的Datasheet PDF文件第258页浏览型号EPM240T100C5的Datasheet PDF文件第259页浏览型号EPM240T100C5的Datasheet PDF文件第260页浏览型号EPM240T100C5的Datasheet PDF文件第261页浏览型号EPM240T100C5的Datasheet PDF文件第263页浏览型号EPM240T100C5的Datasheet PDF文件第264页浏览型号EPM240T100C5的Datasheet PDF文件第265页浏览型号EPM240T100C5的Datasheet PDF文件第266页  
15–6  
Chapter 15: Using the Agilent 3070 Tester for In-System Programming  
Agilent 3070 Development Flow without the PLD ISP Software  
Run the Test Consultant  
Run the Test Consultant to create all of the files for new board development. Once the  
Test Consultant finishes running with this  
setup-only test library, it creates an executable test (without vectors) with the correct  
fixture wiring resource information. Use this file as a template to create the executable  
test’s source code.  
Create Digital Tests  
Create the digital tests, which are required to program the device(s), by copying the  
executable template to the desired program names. For example, if svf2pcf created  
four PCF Files, copy the template file to four executable tests (for example, prog_a,  
prog_b, prog_c, and prog_d) in the digital directory.  
Add these test names to your testorder file and mark them permanent using the  
following syntax:  
test digital "prog_a"; permanent  
test digital "prog_b"; permanent  
test digital "prog_c"; permanent  
test digital "prog_d"; permanent  
Create the Wirelist Information for the Tests  
Compile these executable tests to generate object files (see “Modify the Test Plan”) for  
the setup only versions of the tests. Run Module Pin Assignment to create the  
necessary entries in the wirelist file.  
Next, modify the executable tests so that they contain the vectors to program the  
target device. An includestatement can be used in the executable test, or the vectors  
can be merged into the file. Use the following syntax for the includestatement,  
which should be the last statement in the executable test.  
include "pcf1"  
Remember that the PCF File must reside in the digital directory and must be a digital  
file. To ensure that the digital file is in the correct directory, run the following  
command on the BT-Basic command line:  
load digital "digital/pcf1"  
|
re-save  
You can also use the chtype command at a shell prompt to verify the location of the  
file:  
chtype -n6 digital/pcf1  
Repeat this step for each PCF File.  
Modify the Test Plan  
Add the test statements to the test plan using the following syntax:  
test "digital/prog_a" ! First program file  
test "digital/prog_b" ! Second program file  
test "digital/prog_c" ! Third program file  
test "digital/prog_d" ! Fourth program file  
MAX II Device Handbook  
© October 2008 Altera Corporation  
 复制成功!