欢迎访问ic37.com |
会员登录 免费注册
发布采购

CLK3_1N 参数 Datasheet PDF下载

CLK3_1N图片预览
型号: CLK3_1N
PDF下载: 下载PDF文件 查看货源
内容描述: 的Cyclone III器件手册 [Cyclone III Device Handbook]
分类和应用:
文件页数/大小: 274 页 / 7302 K
品牌: ALTERA [ ALTERA CORPORATION ]
 浏览型号CLK3_1N的Datasheet PDF文件第229页浏览型号CLK3_1N的Datasheet PDF文件第230页浏览型号CLK3_1N的Datasheet PDF文件第231页浏览型号CLK3_1N的Datasheet PDF文件第232页浏览型号CLK3_1N的Datasheet PDF文件第234页浏览型号CLK3_1N的Datasheet PDF文件第235页浏览型号CLK3_1N的Datasheet PDF文件第236页浏览型号CLK3_1N的Datasheet PDF文件第237页  
Chapter 9: Configuration, Design Security, and Remote System Upgrades in the Cyclone III Device Family  
9–75  
Remote System Upgrade  
Functional Description  
The dedicated remote system upgrade circuitry in Cyclone III device family manages  
remote configuration and provides error detection, recovery, and status information.  
User logic or a NiosII processor implemented in the Cyclone III device family logic  
array provides access to the remote configuration data source and an interface to the  
configuration memory.  
1
Configuration memory refers to serial configuration devices (EPCS) or supported  
parallel flash memory, and depends on the configuration scheme that you use.  
The remote system upgrade process of Cyclone III device family involves the  
following steps:  
1. A Nios II processor (or user logic) implemented in the Cyclone III device family  
logic array receives new configuration data from a remote location. The connection  
to the remote source is a communication protocol such as the transmission control  
protocol/Internet protocol (TCP/IP), peripheral component interconnect (PCI),  
user datagram protocol (UDP), universal asynchronous receiver/transmitter  
(UART), or a proprietary interface.  
2. The Nios II processor (or user logic) writes this new configuration data into a  
configuration memory.  
3. The Nios II processor (or user logic) starts a reconfiguration cycle with the new or  
updated configuration data.  
4. The dedicated remote system upgrade circuitry detects and recovers from any  
error that might occur during or after the reconfiguration cycle, and provides error  
status information to the user design.  
Figure 9–32 shows the steps required for performing remote configuration updates  
(the numbers in Figure 9–32 coincide with steps 14).  
Figure 9–32. Functional Diagram of Cyclone III Device Family Remote System Upgrade  
1
2
Data  
Data  
Configuration  
Memory  
Cyclone III  
Device Family  
Control Module  
Development  
Location  
Data  
Device Configuration  
3
August 2012 Altera Corporation  
Cyclone III Device Handbook  
Volume 1  
 复制成功!