欢迎访问ic37.com |
会员登录 免费注册
发布采购

ATTL7583AAJ-DT 参数 Datasheet PDF下载

ATTL7583AAJ-DT图片预览
型号: ATTL7583AAJ-DT
PDF下载: 下载PDF文件 查看货源
内容描述: 线卡接入交换机 [Line Card Access Switch]
分类和应用: 电信集成电路光电二极管
文件页数/大小: 20 页 / 470 K
品牌: AGERE [ AGERE SYSTEMS ]
 浏览型号ATTL7583AAJ-DT的Datasheet PDF文件第6页浏览型号ATTL7583AAJ-DT的Datasheet PDF文件第7页浏览型号ATTL7583AAJ-DT的Datasheet PDF文件第8页浏览型号ATTL7583AAJ-DT的Datasheet PDF文件第9页浏览型号ATTL7583AAJ-DT的Datasheet PDF文件第11页浏览型号ATTL7583AAJ-DT的Datasheet PDF文件第12页浏览型号ATTL7583AAJ-DT的Datasheet PDF文件第13页浏览型号ATTL7583AAJ-DT的Datasheet PDF文件第14页  
Data Sheet  
L7583A/B/C/D Line Card Access Switch  
Switching Behavior  
February 2001  
switch is waiting for the next zero current cross, so it  
can close. During this interval, current that is limited to  
the dc break switch current-limit value will be source  
from the ring node of the SLIC.  
When switching from the power ringing state to the  
idle/talk state, via simple logic level input control, the  
L7583 is able to provide control with respect to the tim-  
ing when the ringing access contacts are released rela-  
tive to the state of the line break contacts.  
This current is presented to the internal protection cir-  
cuit. If the SCR-type protector is used (A or C codes), if  
by random probability the ring-to-idle transition occurs  
during a portion of the ring cycle when the ringing volt-  
age exceeds the protection circuit SCR turn-on volt-  
age, and if current in excess of the SCR’s turn-on  
current is also available, the SCR may turn on. Once  
the SCR is triggered on, if the SLIC is capable of sup-  
plying current in excess of the holding current, the SCR  
may be latched on by the SLIC.  
Make-before-break operation occurs when the line  
break switch contacts are closed (or made) before the  
ringing access switch contact is opened (or broken).  
Break-before-make operation occurs when the ringing  
access contact is opened before the line break switch  
contacts are closed.  
Using the logic level input pins RING, TESTin, and  
TESTout, either make-before-break or break-before-  
make operation of the L7583 is easily achieved. The  
logic sequences for either mode of operation are given  
in Table 13 and Table 14. See the Truth Tables (Table  
16 and Table 17) for an explanation of logic states.  
The probability of this event depends on the character-  
istics of the given SLIC and of the holding current of the  
L7583 A or C device. The SCR hold current distribution  
is designed to be safely away from the test limit of  
80 mA. The higher the distribution, the lower the proba-  
bility of the latch.  
When using an L758X in the make-before-break mode,  
during the ring-to-idle transition, for a period of up to  
one-half the ringing frequency, the ring break switch  
and the pnpn-type ring access switch can both be in  
the ON state. This is the maximum time after the logic  
signal at INRING has transitioned that the ring access  
If this situation is of concern for a given board design,  
either use the A or C series device in the break-before-  
make mode (eliminates the original 25 ms current  
pulse) or use a B or D series device (eliminates the  
SCR).  
Table 13. Make-Before-Break Operation  
Break  
Ring  
Ring  
All Other  
RING TESTin TESTout  
TSD  
State  
Timing  
Switches Return Access Access  
3 & 4  
Switch 7 Switch 8 Switches  
5 V  
0 V  
0 V  
0 V  
0 V  
0 V  
Float Power  
Ringing  
Open  
Closed  
Closed  
Open  
Float Make-  
SW8 waiting for next  
Closed  
Open  
Closed  
Open  
before- zero current crossing  
break  
to turn off maximum  
time—one-half of  
ringing. In this transi-  
tion state, current  
that is limited to the  
dc break switch cur-  
rent-limit value will be  
sourced from the ring  
node of the SLIC.  
0 V  
0 V  
0 V  
Float Idle/Talk Zero cross current  
has occurred.  
Closed  
Open  
Open  
Open  
10  
Lucent Technologies Inc.