欢迎访问ic37.com |
会员登录 免费注册
发布采购

RT6214B 参数 Datasheet PDF下载

RT6214B图片预览
型号: RT6214B
PDF下载: 下载PDF文件 查看货源
内容描述: [暂无描述]
分类和应用:
文件页数/大小: 24 页 / 1529 K
品牌: RICHTEK [ RICHTEK TECHNOLOGY CORPORATION ]
 浏览型号RT6214B的Datasheet PDF文件第2页浏览型号RT6214B的Datasheet PDF文件第3页浏览型号RT6214B的Datasheet PDF文件第4页浏览型号RT6214B的Datasheet PDF文件第5页浏览型号RT6214B的Datasheet PDF文件第7页浏览型号RT6214B的Datasheet PDF文件第8页浏览型号RT6214B的Datasheet PDF文件第9页浏览型号RT6214B的Datasheet PDF文件第10页  
RT6214A/B  
Resume normal  
operation  
Abnormal case  
detected (UV)  
t
= 1.6ms  
HICCUP_ON  
VIN = 12V  
Fault condition  
removed  
= 4.8ms  
HICCUP_OFF  
VOUT  
t
VIN  
EN  
t
t
1ms  
0.25ms  
1ms  
LX  
VOUT  
External Bootstrap Capacitor  
Connect a 0.1F low-ESR ceramic capacitor between  
the BOOT and LX pins. This bootstrap capacitor  
supplies for the gate driver of the high-side N-channel  
MOSFET switch.  
Soft-Start  
(For RT6214A/BHRGJ8F)  
The RT6214A/B provides adjustable soft-start function.  
When the EN pin becomes high, the SS charge current  
(ISS) begins charging the capacitor which is connected  
from the SS pin to GND (CSS).The soft-start function is  
used to prevent large inrush current while converter is  
being powered-up. The soft-start timing can be  
programmed by the external capacitor CSS between SS  
and GND. An internal current source ISS (6A) charges  
an external capacitor to build a soft-start ramp voltage.  
The VFB voltage will track the internal ramp voltage  
during soft-start interval. The typical soft-start time is  
calculated as follows :  
Over-Temperature Protection (Thermal Shutdown)  
The RT6214A/B includes an over-temperature  
protection (OTP) circuitry to prevent overheating due to  
excessive power dissipation. The OTP will shut down  
switching operation when junction temperature  
exceeds a thermal shutdown threshold TSD. Once the  
junction temperature cools down by a thermal  
shutdown hysteresis (TSD), the IC will resume normal  
operation with a complete soft-start.  
Soft-Start (SS)  
Soft-Start time tSS = CSS x 0.7 / 11A + CSS x VFB / ISS  
(For RT6214A/BHRGJ6F)  
tSS = SS rising to FB settled (T2 + T3)  
The RT6214A/B provides an internal soft-start feature  
for inrush control. At power up, the internal capacitor is  
charged by an internal current source ISS to generate a  
soft-start ramp voltage as a reference voltage to the  
PWM comparator. The device will initiate switching and  
the output voltage will smoothly ramp up to its targeted  
regulation voltage only after this ramp voltage is  
greater than the feedback voltage VFB to ensure the  
converters have a smooth start-up. The output voltage  
starts to rise in 0.25ms from EN rising, and the  
soft-start ramp-up time (VFB from 0V to VREF) is 1ms.  
EN  
SS  
SS = 2.1V  
V1  
FB  
T1  
T2  
T3  
PG  
T1 : EN delay, from EN go high to SS start rising, T1 = 55μs;  
T2 : speed up SS, from SS rising to FB start rising, T2 = C x 0.7/11μA;  
SS  
T3 : normal SS, from FB rising to settled, T3 = C x V /I  
;
SS  
V1 : offset voltage between SS and FB, V1 = 700mV;  
PG go high after SSOK (SS = 2.1V)  
FB SS  
Copyright © 2018 Richtek Technology Corporation. All rights reserved.  
is a registered trademark of Richtek Technology Corporation.  
www.richtek.com  
6
DS6214A/B-09 August 2018