欢迎访问ic37.com |
会员登录 免费注册
发布采购

A7BE45ZA 参数 Datasheet PDF下载

A7BE45ZA图片预览
型号: A7BE45ZA
PDF下载: 下载PDF文件 查看货源
内容描述: 单节锂离子/锂聚合物单节锂离子/锂聚合物 [Single-cell Li-ion / Li-polymer Single-cell Li-ion / Li-polymer]
分类和应用:
文件页数/大小: 23 页 / 223 K
品牌: ANASEM [ AnaSem Hong Kong Limited ]
 浏览型号A7BE45ZA的Datasheet PDF文件第4页浏览型号A7BE45ZA的Datasheet PDF文件第5页浏览型号A7BE45ZA的Datasheet PDF文件第6页浏览型号A7BE45ZA的Datasheet PDF文件第7页浏览型号A7BE45ZA的Datasheet PDF文件第9页浏览型号A7BE45ZA的Datasheet PDF文件第10页浏览型号A7BE45ZA的Datasheet PDF文件第11页浏览型号A7BE45ZA的Datasheet PDF文件第12页  
Single-cell Li-ion / Li-polymer Battery Protection IC  
Rev. E09-06  
A7B Series  
z DO : Pch ON resistance, DO : Nch ON resistance --- [Circuit 5]  
Set V1=3.5V, V2=0V and V4=3.0V. (V1-V4)/|IDO| is Pch ON resistance Rdop.  
Set V1=V2=1.8V and V4=0.5V. V4/|IDO| is Nch ON resistance Rdon.  
z Discharge over-current release resistance --- [Circuit 5]  
Set V1=3.5V, V2=0V at first. And then, set V2=1.0V. V2/|IVM| is discharge over-current release resistance Rdwn.  
z Over-charge detection delay time, Release delay time 2 --- [Circuit 6]  
Set V2=0V. Increase V1 from the voltage Vc-0.2V to Vc+0.2V rapidly within 10μs. Over-charge detection  
delay time tc is the time needed for VCO to go "Low" just after the change of V1.  
Next, set V2=1V and decrease V1 from Vc+0.2V to Vc-0.2V rapidly within 10μs. Over-charge release delay  
time trel 2 is the time needed for VCO to go "High" just after the change of V1.  
z Over-discharge detection delay time, Release delay time 1 --- [Circuit 6]  
Set V2=0V. Decrease V1 from the voltage Vdc+0.2V to Vdc-0.2V rapidly within 10μs. Over-discharge  
detection delay time tdc is the time needed for VDO to go "Low" just after the change of V1.  
Next, set V2=-1V and increase V1 from Vdc-0.2V to Vdc+0.2V rapidly within 10μs. Release delay time 1 trel1 in  
case of over-discharge is the time needed for VDO to go "High" just after the change of V1.  
z Charge over-current detection delay time, Release delay time 1 --- [Circuit 6]  
Set V1=3.5V and V2=0V. Decrease V2 from 0V to -1V rapidly within 10μs. Charge over-current delay time tic  
is the time needed for VCO to go "Low" just after the change of V2.  
Next, increase V2 from -1V to 0V rapidly within 10μs. Release delay time 1 trel1 in case of charge over-current  
is the time needed for VCO to go "High" just after the change of V2.  
z Discharge over-current detection delay time, Release delay time 1 --- [Circuit 6]  
Set V1=3.5V and V2=0V. Increase V2 from 0V to 1V rapidly within 10μs. Discharge over-current delay time  
tidc is the time needed for VDO to go "Low" just after the change of V2.  
Next, decrease V2 from 1V to 0V rapidly within 10μs. Release delay time 1 trel1 in case of discharge over-  
current is the time needed for VDO to go "High" just after the change of V2.  
z Load short-circuiting detection delay time, Release delay time 1 --- [Circuit 6]  
Set V1=3.5V and V2=0V. Increase V2 from 0V to 3.5V rapidly within 10μs. Load short-circuiting detection  
delay time tshort is the time needed for VDO to go "Low" just after the change of V2. Next, decrease V2 from  
3.5V to 0V rapidly within 10μs. Release delay time 1 trel1 in case of load short-circuiting is the time needed for  
VDO to go "High" just after the change of V2.  
AnaSem Inc.  
7
.......... Future of the analog world